My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2072
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2013 3:45:21 PM
Creation date
6/27/2013 11:43:31 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2072
Date (mm/dd/yyyy)
06/20/2013
Description
1st Amd to Agmt w/Keith & Schnars, Utility Undergrounding Con, Phase II
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />;� _ KEITH and SCHNARS, P.A. <br />® ENGINEERS, PLANNERS, SURVEYORS <br />v <br />May 23, 2013 <br />Revised June 4, 2013 <br />City of Sunny Isles Beach <br />Attn: Ms. Helen Gray, City Engineer <br />18070 Collins Avenue <br />Sunny Isles Beach, FL 33160 <br />RE: Agreement for Professional Services <br />Project Name: City Utility Undergrounding Consulting, Collins Avenue - Phase II <br />Project Location: Sunny Isles Beach, FL <br />Keith and Schnars Pr000sal No. P5096.MK <br />Dear Ms. Gray: <br />In accordance with your request and subsequent discussions between members of our association and <br />yourself and staff, this agreement between Keith and Schnars, P.A. ('CONSULTANT'), and City of Sunny <br />Isles Beach (°CLIENT' or 'CITY) for professional services is submitted for your consideration and <br />approval. CONSULTANT shall begin work within ten (10) days after receipt of a fully executed copy of this <br />Agreement. <br />I, PURPOSE OF AGREEMENTIPROJECT DESCRIPTION <br />The purpose of this Agreement is to outline the scope of services recommended by CONSULTANT and <br />accepted by CLIENT and to establish the contractual conditions between CONSULTANT and CLIENT with <br />respect to the proposed services. <br />1.0 INTRODUCTION <br />The CITY has undertaken and completed a significant portion of undergrounding of their overhead utilities. <br />What remains can be grouped into four areas; 1) Collins Avenue, 2) Sunny Isles Ocean Beach Boulevard, <br />3) Center Island, and 4) Golden Shores neighborhood. Because of a pending FOOT Resurfacing, <br />Restoration, and Rehabilitation (RRR) project anticipated to start in June 2015, undergrounding within Collins <br />Avenue has taken precedence over the other areas. To minimize disruption to residents, the infrastructure <br />necessary for undergrounding of utilities is to be put in place ahead of and in close coordination with the <br />FOOT RRR project <br />Because this undertaking is heavily dependent upon the responsiveness of outside agencies, with long lead <br />tunes and requisite agreements (i.e., FP &L), it is necessary to fast -track the process to stay ahead of the RRR <br />project. Doing so requires that design be completed by the December 2013, to avoid conflict with <br />commencement of the RRR project. <br />6500 North Andrews Avenue • Ft. Lauderdale, Florida 33309.2132 ) <br />(954) 776 -1616 • (800) 488 -1255 • Fax (854) 771 -7690 ' <br />Attachment "A" <br />
The URL can be used to link to this page
Your browser does not support the video tag.