My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Link Construction Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Link Construction Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:57:38 PM
Creation date
9/5/2013 4:49:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COORDINATION OF CREW LOADING AND CONSTRUCTION SCHEDULING <br />During the course of the project, weekly subcontractor meetings are held on site. Attendance is mandatory for all trade <br />contractors that are currently working on site or projected to be working on site within two weeks. Scheduling issues such <br />as manpower needs and confirmation of material procurement are among the topics discussed during these meetings, the <br />minutes of which are recorded in the project log and distributed to all parties scheduled to be in attendance. Two week <br />look -ahead schedules are generated for each meeting by Link Construction Group thus providing an detailed management <br />tool to effectively coordinate manpower requirements with subcontractors. <br />The key to successful crew loading and construction scheduling is a detailed knowledge of per man unit production. Ba- <br />sically stated, this equates to the total man -hours required to complete each and every work activity. This can be difficult <br />to achieve, but Link Construction Group has established relationships with its subcontractors and these expectations have <br />become "the standard ". If we find a subcontractor not meeting our requirements, we will supplement their forces immedi- <br />ately. <br />® 4) PRIMAVERA <br />E <br />rhn Microsoft Office <br />a5- Project <br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements I Step 1 <br />rE4 > c, <br />SURETrack® <br />Online Acc t Management <br />pram <br />
The URL can be used to link to this page
Your browser does not support the video tag.