My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Link Construction Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Link Construction Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:57:38 PM
Creation date
9/5/2013 4:49:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ABOUT FES <br />FLORIDA ENGINEERING SERVICES <br />FES <br />FES is a full service Mechanical, Electrical and Fire Protection Engineering Firm with over 35 years of experience serving <br />the South Florida Construction market. It has made its mark and earned respect by consistently providing its clientele with <br />efficient, cost effective designs and solutions. For the past 27 years we have consistently operated from the same local in <br />North Miami Beach and have always insisted in providing the best engineering practices and commodities in benefit of <br />our clients; in addition to offering visionary and proper up -to -date solutions that apply to 21 Century engineering needs and <br />requirements, with immediate and long term benefits that positively reflect on our client's Return -On- Investment. <br />El <br />p <br />1 <br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements I Step 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.