My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Link Construction Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Link Construction Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:57:38 PM
Creation date
9/5/2013 4:49:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u <br />WAMI - DACE A7iami -Dade County <br />Internal Services Department <br />Statement of Technical Certification Categories <br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements I Step 1 <br />F=: SRS Engineel'vg, Inc. <br />5001 SW 7401 Coat. Suite 201 <br />M¢mi Lakes, FL 33155 <br />CATEGORY <br />APPROVAL EXPIRATION <br />NQ: <br />CATEGORYDESCRIPTIGN <br />DATE <br />DATE <br />3.01 <br />HIGIIWAY SYSTEMS - SITE DEVELOPMENT AND PARIGNG LOT DESIGN <br />8'82012 <br />W312014 <br />302 <br />HIGHWAY SYSTEMS - HIGHWAY DESIGN <br />11182012 <br />81312014 <br />306 <br />HIGHWAY SYSTEMS - TRAFFIC CALMING <br />8182012 <br />8312014 <br />3.09 <br />HIGHWAY SYSTEMS- SIGNING, PAVEMENT MARKING - AND <br />11'82012 <br />81312014 <br />CHANNELIZATION <br />4.01 <br />AVIATION SYSTEMS- ENGINEERING DESIGN <br />8782012 <br />81312014 <br />801 <br />PORT AND WATERWAY SYSTEMS- ENGINEERING DESIGN <br />B31=2 <br />8312014 <br />5.03 <br />PORT AND WATERWAY SYSTEMS- CRUISE TER.WNAL DESIGN <br />&1M12 <br />8!312014 <br />5.05 <br />PORT AND WATERWAY SY STEMS - CARGO TERMINAL DESIGN <br />&'82012 <br />8372014 <br />5.08 <br />PORT AND WATERWAY SYSTEMS- MARINE ENGINEERING DESIGN <br />&SW12 <br />8312014 <br />601 <br />WATER AND SANITARY SEWER SYSTEMS - WATER DISTRIBUTION AND <br />8782012 <br />81312014 <br />SANITARY SEWAGE COLLECTION AND TRANSMISSION SYSTEMS <br />6.02 <br />WATER AND SANITARY SEWER SYSTEMS - MAJOR WATER AND <br />8182012 <br />8/312014 <br />SANITARY SEWAGE PUMPING FACILITIES <br />10.01 <br />ENVIRONMENTAL ENGINEERING- STORMWATER DRAINAGE DESIGN <br />11182012 <br />8!312014 <br />ENGINEERING SERVICES <br />11.00 <br />GENERAL STRUCTURAL ENGINEERING <br />&82012 <br />8312014 <br />16.00 <br />GENERAL CIVIL ENGINEERING <br />8182012 <br />W312014 <br />17.00 <br />ENGINEERING CONSTRUCTION MANAGEMENT <br />81 &2012 <br />8312014 <br />21.00 <br />LAND -USE PLANNING <br />8182012 <br />8312014 <br />rUeaa,%/ <br />A &'41�j <br />Lukm M. MILen, R. <br />A-, CNUUperson <br />Cloet, Protass'orW Services Division <br />In: I Services Depart <br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements I Step 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.