Laserfiche WebLink
KEY PERSONNEL RESUME <br />RONALD DURAN, P.E. <br />PROJECT MANAGER AT AXIOMA3 <br />-Carnival Cruise Lines Building (1994— 1996) <br />7 -Story; 200,000 SF. Concrete structure on auger cast piles. Miami, Fla. Full design and Inspection <br />-Bella Vista at Porto Vita Condominium (1991 —1992) <br />8 -story concrete design and Inspection. Aventura, Florida. <br />-Partial design for The Yacht Club At Brickell and the Yacht Club at South Beach (1994) <br />Post - tensioned slabs, beams and misc. structures. <br />-Justice Center Building (1992— 1993) <br />17 -story, 7 parking garage floors plus 10 office levels. Miami, Florida. <br />•120 -bed Nursing Home (1992— 1993) <br />For the Veteran Administration. West Palm Beach, Florida. <br />-Beth Torah Congregation Center Complex (1990 -1992) <br />Concrete structures: School, church, assembly room and other. North Miami, Florida. <br />-The Miami Center Parking Building Addition (1990— 1992) <br />12 -story concrete building addition. Downtown Miami, Florida. <br />-Partial design works in Hi -rise Projects (1990— 1992, 1994— 1997) <br />Bristol Tower, 52 -Story; ANA Hotel, 42 -Story; Santa Maria Building, 54 -story and more. Miami, Florida. <br />-Concourse F to G Wrap Around (1985 — 1986) <br />Dry concrete building expansion, auger cast piles, Miami International Airport, Miami, Florida. <br />storation /remodeling of the Biltmore Hotel (1985 —1987) <br />Design and Inspection. 17 floors. Coral Gables, Florida. <br />-North District Police Station parking structural and drainage 11988 — 1989) <br />3 -Story parking struct. with precast/prestressed joists. Work included design and inspection. Miami, FL. <br />-Numerous residential designs (1983 to Date) <br />Restoration, additions, upgrade /update to latest Codes and new house structures. <br />2B. SPECIAL BUILDING ENGINEERING SERVICES <br />-Inspections and /or forensic engineering services (2004 to Date) <br />Inspection and design of repairs for maintenance or 40 -year certification and /or re- certification of over 30 condominium buildings <br />consisting of high -rises or apartment conglomerates, Miami -Dade and Broward. <br />3. CIVIL/STRUCTURAL ENGINEERING (VECP = "VALUE ENGINEERING CHANGE PROPOSAL ") <br />-Study of sheet pile walls for vacuum pump stations (2009 —2010) <br />Thousands of linear feet of temporary sheet pile walls up to 70+ feet of penetration for new flood - relieve pump stations in Lake Pon- <br />tchartrain, New Orleans, Louisiana. <br />-Bulkhead retaining wall(2001 — 2003) <br />VECP Services; MSE walls and steel sheet pile walls for Southern Blvd. and 1 -95 interchange. West Palm Beach. Client: Archer West- <br />ern Contractors. <br />-Analysis, review and improvement of sheet pile containment wall (2002) <br />&he Palmetto Expressway and NW 36th Street project. Client: Sanchez- Zeinalli <br />Mohouse at Crandon Park Golf Course (2000 — 2002) <br />4 -acre parking lot and building area re- grading and drainage, and 2/3 -mile of water main extension. <br />F � ,P <br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements I Step 7 jUm„o�� <br />