My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Link Construction Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Link Construction Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:57:38 PM
Creation date
9/5/2013 4:49:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Aida M. Albaisa. P.E. <br />Partner <br />Mrs. Albaisa has been a practicing structural engineer for the last twenty -six nears. <br />Ilavine a degree in Architectural Engineering reinforces her sensitivity to <br />architectural considerations in structural concepts. Mrs. Albaisa .s design experience <br />involves projects chose structural wstem includes precast prestressed concrete. <br />cast -in -place concrete and steel framing. <br />Education <br />• Bachelor of Science. Civil EnLinecrine. University of Miami — 1987 <br />• Bachelor of Science. Architectural Engineering. University of-Miami — 1987 <br />Re,istratimr <br />♦ Registered 1'rofessional Engineer. State of Florida <br />♦ Special Inspector of Threshold Buildings. State of Florida <br />Professional Affiliations <br />♦ American Society of Civil Engineer <br />♦ Florida Structural F,ngincers .Association <br />Relevant ProjecA <br />• Miami International Airport —North Terminal Development. B -C Infill <br />• Miami Intermodal Center — MetroRail Station <br />• Miami International Airport — South TcrminallFerminal l l Improvements <br />• Boca Raton Museum of An <br />• Looe Art Museum <br />• Miami Beach Senior I lib <br />• North Miami Senior Ifigh (State School BBBI) <br />• State School CCCI <br />• I Iigh School GGG <br />• High School I I1 <br />• I ligh School LLL <br />• K -8 State Schools CC -l. DD -l. D. F -I. 1' -I. TT -1 and AA? <br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements I Step 1 <br />D° <br />DDA <br />ENGINEERS, P.A. <br />l_1.IU U� <br />�m <br />
The URL can be used to link to this page
Your browser does not support the video tag.