My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Link Construction Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Link Construction Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:57:38 PM
Creation date
9/5/2013 4:49:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OFFICE OF CnY MANAGER <br />201 WESTWARD DRIVE <br />MAM SPPoNGS. FL 33166 <br />Of <br />f U11All` H iiiFS11'f�1�11 130.51 x05.5010 <br />FAX <br />Florida <br />t305, eossoao <br />Dear Sir or Madam: <br />It is with pleasure that I write today concerning the relationship between the City of Miami Springs <br />and the construction firm of Link Construction and the architectural firm of Rodriguez - Pereira. <br />Miami Springs has been in the process of a design -build project with these firs for a new $6 <br />® million community center to replace our old recreation center complex. <br />The leader of this project has been Link Construction. We are in the first phase of removing an old <br />parking lot and preparing the foundations for the new center. During this process, both Link and <br />Rodriguez- Pereira have been outstanding in working with staff and concerned residents to achieve <br />the best possible design for the building, as it sits in the middle of a single family neighborhood. <br />Many changes had to be made as a result, but always at the request of the City. Both firms have <br />been very understanding and accommodating to suggested changes. <br />If there is one thing that wig send up a red flag with residents it is change orders to major contracts. <br />One of the best features of our experience to date has been that Link gave us a 'guaranteed <br />maximum price' that Included a contingency of $120,000. This guarantee was for Link initiated <br />change orders. If the City wanted a change order after the construction commenced, then that will <br />be the responsibility of the City. However, we are confident that through the positive relationship <br />we have developed with Link that we have designed a building up front that should avoid the need <br />for change orders. <br />I hope this letter helps with your decision. <br />Sincerely, <br />James R. Boqmann <br />City Manager <br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements I Step 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.