My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Link Construction Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Link Construction Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:57:38 PM
Creation date
9/5/2013 4:49:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />,�C`rY o! £rrct`t�c <br />Office of the City Manager <br />April 18, 2008 <br />City of <br />Aventura. <br />Government Center <br />19200 West Country Club Drive <br />Aventura, Florida 33180 <br />Link Construction Group <br />C/O Mr. Guillermo Femandez <br />7003 N. Waterway Drive, Suite #218 <br />Miami, FL 33155 <br />Re: Letter of Reference <br />We, the City of Aventura would like to express its great appreciation for the work and <br />® efforts of Link Construction Group, Inc. has provided throughout the construction of <br />Waterways Park Expansion and the addition of the Waterways Dog Park. <br />Mr. Femandez and project manager Nick Fuoco have demonstrated uncommon <br />professionalism and competency that successfully conveyed the design and engineer's <br />design and plans from paper to the actual construction of the two parks simultaneously. <br />All the while, providing a very satisfying park and recreation center. <br />It is with highly unusual, especially given the few challenges up front, that volumes of <br />government regulations and information were successfully incorporated into a <br />comprehensive, accurate and consistent construction and construction management that <br />in turn ensured function and aesthetic excellence throughout the City of Aventura Parks <br />and Recreation systems. <br />Mr. Fernandez and his associates Mr. Nick Fuoco and Mr. Bill Racavich, through <br />dedication, have earned the respect of this City. My staff and I thought it important that <br />you know how much we appreciate their efforts. <br />Very truly yours, <br />Antonio F. Tomei <br />Capital Projects Manager <br />E <br />PHONE: 305-4668910 • Fnx: 305 - 4668919 <br />w .ciryofawntura.com <br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements I Step 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.