My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Link Construction Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Link Construction Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:57:38 PM
Creation date
9/5/2013 4:49:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T A tj 5 - il <br />i r <br />March 17, 2010 <br />To Whom It May Concern: <br />It is with pleasure that I act as a professional reference for Guillermo (Willy) <br />Fernandez and Mickey Cerra of LINK Construction Group, Inc.. <br />I have known Guillermo and Mickey for several years, while we worked on the <br />Causeway Square Project in North Miami. <br />I can definitely tell you that Link's partnering with our Architect to provide on the <br />spot conflict resolutions was an integral part in the completion our signature mixed <br />use project. They produced a quality team that was devoted to the objectives of the <br />Project with poise and aptitude. Their teams dedication to quality customer service <br />® was bar none. The quality of the finishes were outstanding while accelerating the <br />schedule and at the same time increasing owner's savings in the budget which was <br />shared upon completion of the project. <br />I can confidently recommend Link Construction Group for future construction projects <br />whether it is pre - construction, general contracting, construction management or <br />design- build. <br />If I may provide you with any further information in your consideration of Link <br />Construction Group, please feel free to contact me. <br />of Construction <br />(305) <br />RFIQ No. 13 -08 -01 Gateway Park Pedestrian Access Im pro v ements � Step 1 ME, <br />
The URL can be used to link to this page
Your browser does not support the video tag.