My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Link Construction Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Link Construction Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:57:38 PM
Creation date
9/5/2013 4:49:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Savino & Miller Design Studio <br />Role: Landscape Architect <br />savinanitter Address: 12345 NE 6th Avenue, Suite A I North Miami, A 33161 <br />Telephone: 305.895.9082 <br />Fax: 305.895.9083 <br />Website: www.savinomiller.com <br />Entity: Corporation <br />Established: April 16, 1993 (20 years ago) <br />Litigations:ln Mediation Process (List available upon request) <br />Name: SRS Engineering, Inc. <br />Role: Civil Engineer <br />MAddress: 5001 SW 74th Court, Suite 2011 Miami, Fl 33155 <br />I Telephone: 305.662.8887 <br />Fax: 305.662.8858 <br />Website: www.srs- corp.com <br />Entity: Corporation <br />Established: September 11, 1995 (18 years ago) <br />® Litigations: In Mediation Process (List available upon request) <br />RFQ No. 13 -08 -01 Gateway Park Pedestrian Access Improvements I Step 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.