Laserfiche WebLink
C <br />1 <br />1 <br />i <br />B <br />1 <br />[1 <br />[1 <br />1 <br />i <br />I <br />1 <br />1 <br />1 <br />U <br />STAFFING - RELEVANT EXPERIENCE <br />Anzac Contractors was the prime Contractor <br />Description of the Anzac Contractors was the Design/Build Contractor on this project that involved the demolition and replacement <br />scope of the work of two existing bridges, Maintenance of Traffic construction of a temporary road and canal crossing to provide <br />access to a high - profile residential island community during bridge replacement, clearing, roadway, channel <br />excavation, slope protection, temporary & permanent steel sheet pile walls, traffic railings, approach slabs, large <br />CMP Culverts, paving, drainage, guardrails, pavement markings and signage, lighting & signalization, temporary <br />& permanent water main construction, utility jack and bores, landscaping 8 sodding, stamped concrete structural <br />slabs, decorative brick walls and copings on bridge crossing and quality control testing. <br />Owner /Agency, City of Plantation <br />Client Name, 400 NW 731d Avenue <br />address, Plantation, FL 33317 <br />phone number, Brett Butler, P.E., City Engineer <br />email address Tel. 954 - 797 -2781 bbutler @plantafion.org <br />Total Construction Estimated Cost I $2.5 Million I Total Construction Actual Cost I $2,243,856.00 <br />Project Status Completed (January 2004) <br />23 <br />