My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ric-Man International Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Ric-Man International Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:46:49 PM
Creation date
9/9/2013 4:21:58 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />1 <br />1 <br />i <br />B <br />1 <br />[1 <br />[1 <br />1 <br />i <br />I <br />1 <br />1 <br />1 <br />U <br />STAFFING - RELEVANT EXPERIENCE <br />Anzac Contractors was the prime Contractor <br />Description of the Anzac Contractors was the Design/Build Contractor on this project that involved the demolition and replacement <br />scope of the work of two existing bridges, Maintenance of Traffic construction of a temporary road and canal crossing to provide <br />access to a high - profile residential island community during bridge replacement, clearing, roadway, channel <br />excavation, slope protection, temporary & permanent steel sheet pile walls, traffic railings, approach slabs, large <br />CMP Culverts, paving, drainage, guardrails, pavement markings and signage, lighting & signalization, temporary <br />& permanent water main construction, utility jack and bores, landscaping 8 sodding, stamped concrete structural <br />slabs, decorative brick walls and copings on bridge crossing and quality control testing. <br />Owner /Agency, City of Plantation <br />Client Name, 400 NW 731d Avenue <br />address, Plantation, FL 33317 <br />phone number, Brett Butler, P.E., City Engineer <br />email address Tel. 954 - 797 -2781 bbutler @plantafion.org <br />Total Construction Estimated Cost I $2.5 Million I Total Construction Actual Cost I $2,243,856.00 <br />Project Status Completed (January 2004) <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.