My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ric-Man International Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Ric-Man International Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:46:49 PM
Creation date
9/9/2013 4:21:58 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />J <br />U <br />C' <br />I <br />I <br />Ir <br />L <br />I <br />J <br />E <br />STAFFING- RELEVANT EXPERIENCE <br />Ric -Man International served as the prime contractor <br />Description of the Project consisted of installing new 8' WM and connecting homes in front and rear, drainage improvements <br />scope of the work including over 250 structures, 18,000 LF of drainage pipe, and 6 pump stations, as well as lighting, <br />landscaping, and hardscape improvements. Construction had to contend with accommodating the needs of <br />the residents and working around two schools and a hospital. Close coordination with homeowners, schools, <br />businesses, and public transportation was essential. The overall approach to the project was to provide quality <br />improvements with minimal impact to residents. <br />Owner <br />City of Miami Beach <br />Client <br />Aurelio Carmenates P.E., Capital Projects Coordinator <br />Address <br />1700 Convention Center Drive <br />No <br />Miami Beach, FL 33140 <br />Phone <br />(954) 999 -8731 <br />Email <br />acarmenates(a)corradino.com <br />General Contractor <br />Ric -Man International, Inc. <br />Victor G. Menocal, Project Manager <br />Stormwater <br />Luis Hernandez, Superintendent <br />Construction Cost <br />$34.8 million <br />Completion Date <br />2010 <br />Construction Details <br />74 each <br />Scope of Work <br />Design/Build Project <br />FPL Undergrounding <br />Residencies <br />Businesses <br />Streetscape <br />Trees <br />Decorative Lighting <br />Sidewalks / Driveways <br />Curb <br />Decorative Pavers <br />Roadway <br />Milling & Resurfacing <br />Roadway Reconstruction <br />Swale Reconstruction <br />Signalization <br />25 <br />Water Main <br />Yes <br />New Water Main <br />34,000 LF <br />No <br />New Fire Hydrants <br />23 each <br />772 <br />Rear Easement Services <br />190 HDD; 620 open cut <br />36 <br />Stormwater <br />1,100 each <br />Manholes <br />92 each <br />190 each <br />Catch Basins <br />74 each <br />38,000 SF <br />Drainage Mains <br />17,000 LF <br />2,500 LF <br />Pump Stations <br />6 <br />0 <br />Disposal Wells <br />46 each <br />Force Main <br />4,500 LF <br />Sanitary Sewer <br />128,000 SY <br />Sanitary Manholes <br />0 <br />0 <br />Sanitary Sewer Main <br />0 <br />219,000 SF <br />Sewer Lining <br />0 <br />No <br />Sewer Pump Stations <br />0 <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.