<br />Verona Avenue Bridge Over Golden Gate Canal,
<br />FDOT FIN NO. 405904- 1 -52 -01, CONTRACT NO.
<br />T6028, FAP NO. 629026U
<br />Golden Beach, FL
<br />Replacement of existing bridge and Roadway with a
<br />Highly Decorative Bridge in one of the wealthiest
<br />neighborhoods in South Florida. Anzac submitted and
<br />received approval from the Department on the
<br />following VECP(s):
<br />1. Replaced 18" Augercast Piles designed to
<br />support a Load Transfer Platform under the
<br />Road with a 6" CSV Grout Piles and
<br />reengineered the LTP, saving substantial
<br />money and utilizing a much cleaner method.
<br />2. Redesigned a complicated precast panel
<br />bulkhead with combination of Coated Steel
<br />Sheeting and Composite H- Piles.
<br />Other engineering redesigns or solutions that Anzac
<br />initiated and received approval on were:
<br />1. Made the Department aware of the extent of
<br />deterioration of the existing bridge structure
<br />that was utilized during construction of Phase I
<br />new construction. Within the first days on the
<br />job, Anzac discovered that the existing bridge
<br />slabs were failing and needed an immediate
<br />emergency fix; this was the only way on & off
<br />a very high profile neighborhood island
<br />community. Anzac engineered a temporary
<br />steel support structure that was placed under
<br />the existing bridge, received the Department's
<br />approval and within days after discovery of the
<br />problem had the temporary structure installed.
<br />2. Redesigned a cast -in -place portion of the new
<br />structure as a Precast element, saving time on
<br />construction of the Superstructure deck.
<br />3. Redesigned a complicated CIP Structural
<br />Concrete Beam supporting a new Force Main
<br />with a Precast solution.
<br />4. Redesigned the alignment and fittings needed
<br />for a new Force Main and Water Main to better
<br />accommodate site conditions and construction
<br />phasing. This saved MDWASD (Force Main)
<br />and Town of Golden Beach (Water Main)
<br />money on their corresponding JPA(s) with the
<br />Department.
<br />Work involved in this project included but was not
<br />limited to Removal of Existing Structures, MOT with
<br />Temporary Traffic Signals at each end of the project to
<br />provide one lane traffic across the bridge, 48" Drilled
<br />Shafts (self - performed from a barge in a very tight
<br />canal),
<br />Reinforcing Steel, Concrete, Prestressed Deck slabs
<br />with CIP Superstructure Deck, Steel Sheet Piling,
<br />Seismic Monitoring of Multimillion Dollar Houses within
<br />15 If of construction and Existing Seawalls that
<br />connect to the new construction, Road, Paving,
<br />Drainage, Utilities, Force Main & Water Main,
<br />Irrigation, Sodding, Landscaping, Fencing, Steel
<br />Handrails, Class V Coating. Anzac received an overall
<br />grade of "102" from the Department on this project.
<br />US -27 Bridges, Everglades Construction Project
<br />Storm Water Treatment Area 3/., South Florida
<br />Water Management District Contract No. C -E306
<br />Palm Beach County, FL
<br />Construction of two new bridges and roadwork along
<br />US -27 near the Palm Beach/Broward County lines.
<br />Project involved excavating a new canal across the
<br />existing lanes of US -27 and subsequently constructing
<br />two new bridges across the new canal. Anzac
<br />submitted and received approval on major redesign of
<br />the MOT. The redesign eliminated the need for a large
<br />amount of temporary steel sheet piling and saved
<br />significant time and money on the project.
<br />Work involved on this project involved but was not
<br />limited to Clearing, MOT and Temporary Road
<br />Construction, Excavation of new canal, Pile Driving,
<br />Reinforcing Steel, Concrete, FDOT Twin Tee Bridge
<br />Beams, Traffic Railing, Class V Coating, Rubble Rip
<br />Rap, Road, Drainage, Grading, Paving, Striping &
<br />Signs, Seeding & Sodding.
<br />US 1 Bridges, FDOT Fin # 249856- 1 -52 -01, Miami
<br />Dade County, FL
<br />Worked as the Bridge Subcontractor and Design Build
<br />Team member under the Prime Contractor,
<br />Community Asphalt Corp. Anzac was involved from
<br />the beginning of this project assisting with the design
<br />of three bridges on this project. One bridge was a
<br />replacement of an existing bascule bridge with a new
<br />longer three span bridge (233' -0' long). Work involved
<br />18" and 24" piles, Type III AASHTO Girders, cast -in-
<br />place deck, traffic railing barriers, MSE walls and
<br />coping, channel excavating, removal of an existing
<br />large 3 span bascule bridge. The other two new
<br />bridges were for Wildlife Crossings, work involved
<br />large footing excavators, tremie seals, cast -in -place
<br />concrete substructures and superstructures, traffic
<br />railing barriers, approach slabs and MSE walls.
<br />1 39