Laserfiche WebLink
1 <br />GEORGE VALDES <br />Bridge Superintendent <br />EDUCATION: <br />Miami -Dade Community College, 1979 -1980 <br />EMPLOYMENT: <br />Anzac Contractors, Inc. <br />Superintendent <br />1987 - Project Superintendent <br />Mr. Valdes has over 30 years experience in the <br />construction industry and is responsible for the <br />negotiating deals with subs & suppliers, procurement <br />of materials, meeting with Clients, Engineers & <br />Inspectors, coordination and "hands -on" involvement <br />in all aspects of construction on the assigned project, <br />equipment inspections, acquisitions & maintenance. <br />RELEVANT EXPERIENCE: <br />Broward Boulevard Bridge Replacements <br />Broward County, FL <br />Design -Build contractor on project that involved the <br />demolition and replacement of two existing bridges, <br />MOT, construction of a temporary road and canal <br />crossing to provide access to residential island <br />community during, Gearing, roadway, channel <br />excavation, slope protection, temporary & permanent <br />steel sheet pile walls, traffic railings, approach slabs, <br />large CMP culvers, paving, drainage, markings and <br />signs, lighting, signalization, water main construction, <br />utility jack and bores, landscaping and sodding, <br />stamped concrete structural slabs, decorative brick <br />walls and copings on bridge crossings, quality control <br />testing. <br />SR-821 Florida's Turnpike /Campbell Drive <br />Homestead, FL <br />Construction of two new bridges over South Florida <br />Water Management District Canal C -103 for <br />interchange, 18' piles, Type II AASHTO girders, CIP <br />decks, traffic railing, floor grooving, approach slabs, <br />class V coating, MSE walls. <br />Robert King High Park Bridge Replacement <br />Miami Dade, FL <br />Replacement of existing bridge with decorative new <br />bridge, new road, 2 new fully functional lighthouses, <br />Channel Excavation, 18" Piles, Steel Sheet Pile <br />Bulkhead Walls, CIP decks, Coral Stone Exterior, <br />Coral Tile Sidewalks & Copings, Lighting, Irrigation, <br />Sodding, Paving, Drainage, Markings & Signs. Anzac <br />met two No-Excuse Bonus Milestones and obtained a <br />99% Performance Rating from FDOT. <br />Florida Power and Light Turkey Point Nuclear <br />Power Plant Seawall Repairs <br />Homestead, FL <br />Anzac bid and was awarded this project by offering a <br />major redesign of the bid drawing which saved FPL <br />time and money. Repairs to -2000 if of existing Steel <br />Sheet Pile Seawall with a 15ft deep reinforced <br />concrete facing, installation of -2000 if of new Steel <br />Sheet Piling & Water System, Cathodic Protection <br />System, Excavation, Grading, Road. The project is <br />located on Biscayne Bay and was permitted and <br />monitored by DERM. Anzac had zero incidents <br />working under strict DERM controls. <br />Deer Fence Bridge, South Florida Water <br />Management District <br />Hendry County, FL <br />Replacement of existing structures, channel <br />excavation, rubble rip rap, 18" piles, prestress deck <br />slabs, post- tensioning, road, grading & drainage. <br />Project was located in a remote part of the Everglades <br />as was built under strict environmental controls; Anzac <br />had zero incidents. <br />C-4 Emergency Detention Basin, South Florida <br />Water Management District <br />Miami Dade County, FL <br />Construction of a new bridge, channel excavation, rip <br />rap, 18" piles, prestress deck slabs, post- tensioning, <br />approaches. Project was constructed in the sensitive <br />Everglades environment with no incidents. <br />Lyons Road Bridge from Clint Moore Road to <br />Linton Boulevard <br />Palm Beach County, FL <br />Construction of a new bridge, 18' piles, channel <br />excavation, revetment mats, Type IV ASSHTO girders, <br />CIP deck, traffic railing, floor grooving, approach slabs, <br />Gass V coating. <br />Broad Causeway West Relief Bridge Replacement, <br />Town of Bay Harbor Islands <br />Miami Dade County, FL <br />Replacement of two bridges, MOT, Excavation, <br />Removal of Existing Structures, Paving, Drainage, 18" <br />Piles, Prestress Slab Units, Custom Decorative Traffic <br />Railing, Curb & Gutter, Guardrail, Landscaping, <br />Irrigation, Utility Crossings, Lighting & Signalization, <br />Markings & Signs. Working in sensitive Biscayne Bay <br />environment under strict permits & controls by FL DEP <br />& MDC DERM for water quality and mangrove tree <br />trimming with zero incidents. <br />41 <br />