My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ric-Man International Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Ric-Man International Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:46:49 PM
Creation date
9/9/2013 4:21:58 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
While we understand that construction can be a major nuisance for the residents, RMI will attempt to minimize the impact to the <br />residents as follows: <br />• Noise Control - We will provide the necessary requirements for noise control during the construction period. Noise <br />procedures will conform to the applicable OSHA requirements and local ordinances having jurisdiction on the work. This <br />will be accomplished by providing sound barrier enclosures around our dewatering pumps near residences. De- watering <br />pump noise levels during night time hours shall not exceed 55 db measured at the property line of a residence. <br />• Dust Control - We will provide positive methods and apply dust control materials to minimize raising dust from <br />construction operations, and provide positive means to prevent air -bome dust from dispersing into the atmosphere. This <br />will be accomplished by the use of Water Trucks, broom tractors and limiting the double handling of fill and excavated <br />materials. <br />• Water Control - We will provide methods to control surface water to prevent damage to the project, the site, or adjoining <br />properties. This will be accomplished by controlling fill, grading and ditching to direct surface drainage away from <br />excavations, pits, tunnels and other construction areas; and to direct drainage to proper runoff. We will provide, operate <br />and maintain hydraulic pumps of adequate capacity to control surface and water. We will dispose of drainage water in a <br />1 manner to prevent flooding, erosion, or other damage to any portion of the site or to adjoining areas. <br />• Safety - No matter what the time frame constraints demand, the need for safety is the Project Team's primary concern. <br />The two primary methods for ensuring the safety of all parties involved, especially the general public, are through <br />planning and training. Through proper planning, dangerous conflicts are avoided and the project is well scheduled. This <br />allows the work to progress at an efficient, yet safe pace. Through proper training and retention of personnel, the design <br />' and construction team are never in a position where inaction can cause bodily harm. All the proper personnel are trained <br />in confined spaces and as competent persons for the project team through OSHA certified personnel. <br />i <br />1 <br />1 <br />1 <br />1 <br />1 <br />0 <br />1 70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.