My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lynx Construction Management
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Lynx Construction Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:53:47 PM
Creation date
9/9/2013 4:33:18 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r� <br />1 <br />1 <br />t <br />t <br />toX <br />CONSTRUCTION <br />MANAGEMENT <br />South Miami Hospital. South Miami, Florida <br />169 ft glass enclosed, two -level pedestrian bridge connecting the hospital to a medical office <br />building <br />rs 9 <br />South Miami US -1 Pedestrian Bridee. South Miami, Florida <br />Conceptual design for a pedestrian overpass linking the South Miami Metrorail Station with the <br />City's vibrant downtown business district. It features, elevators, stairs, landscaping and <br />architectural features <br />L - vexes +- <br />ff <br />FL: CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 10 of 66 <br />FL: CMC1250004 NC:69344 0:305.523.3656 1 F: 888.499.1748 i LynxConstruction Management.com RFQ #13 -08 -01 <br />TN: 63012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.