My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lynx Construction Management
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Lynx Construction Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:53:47 PM
Creation date
9/9/2013 4:33:18 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L �X <br />`/CONSTRUCTION <br />MANAGEMENT <br />Terminal Wide Peoole Mover Svstem. Miami International Airport - Miami, Florida <br />Covered bridges totaling over 3500 feet, connecting all passenger concourses and parking <br />garages <br />F <br />Tallahassee Memorial Hosoital. Tallahassee, Florida <br />153 foot long, 2 -story covered bridge to connect the new addition to the existing hospital <br />The Plaza St. Petersburg, Florida <br />Bridge connecting office building and parking garage <br />FL CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 12 of 66 <br />FL: CMC1250004 NC:69344 0:305.523.36561 F: 888.499.1748 1 LynxConstruction Management.com RFQ#13 -08 -01 <br />TN: 63012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.