My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lynx Construction Management
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Responses
>
Lynx Construction Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2013 5:53:47 PM
Creation date
9/9/2013 4:33:18 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design build svcs for Gateway Park Pedestrian bridge- STEP 1
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u <br />Mn ONSTRUCTION <br />MANAGEMENT <br />• Principal In Charge, Project Manager <br />Florida State University Parking Garage No. 2, Tallahassee, Florida <br />• The 850 car parking structure has 4 -level of parking at the perimeter and 3 -level of scissors ramps <br />parking at the middle section of the building. <br />• Engineer of Record, Project Manager <br />Florida State University Parking Garage No. 3, Tallahassee, Florida (Design - Build) <br />• The design of this 1,500 car parking garage consists of six, 62 -feet bays, and has 4- levels of parking at <br />the perimeter and at the middle two bays of the building, and 3- levels of parking at the interior <br />scissors ramps. The garage has two -way traffic on each floor and vehicular access at two different <br />levels. <br />• Principal in Charge <br />City of Hialeah Parking Garage, Hialeah, Florida <br />• 5 levels; 365 cars <br />• Engineer of Record, Project Manager <br />Miami Free Zone Parking, Miami, Florida <br />• 5 levels of parking for 1,550 cars below 4 levels, 90,000 -SF office building <br />• Incorporating of an existing pedestrian bridge running through the new building. <br />• Principal in Charge, Engineer of Record, Project Manager <br />Oceanside Plaza Garage, Pompano Beach, Florida <br />• Three -level parking structure for 500 cars topped with a landscaped pool deck, with retail on the <br />ground level. <br />• Project Engineer <br />The George Garage, Coral Gables, Florida <br />• 4 -story parking garage with a recreation deck on top. <br />• Primary structural frame consists of composite precast concrete system. <br />• Engineer of Record, Project Manager <br />Education <br />Bachelor of Science in Civil Engineering' <br />University of South Florida May 1994 <br />Major: Structural Engineering <br />FL: CGC1518494 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 26 of 66 <br />FL: CMC1250004 NC: 69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 <br />TN: 63012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.