Laserfiche WebLink
k <br />1 <br />V <br />E <br />1 <br />I <br />P <br />fl <br />1 <br />L N x <br />.� CONSTRUCTION <br />MANAGEMENT <br />2. QUALIFICATIONS <br />Lynx Construction Management has arranged the best qualified team to perform this contract. <br />The team far exceeds the requirements of this RFQ. Some of what Lynx brings to the table is its <br />vast financial and bonding capacity, as well as the design -build experience and previous project <br />involvement with the team. Lynx's principals have a long history and have worked with M.C. <br />Harry for 20 years and currently working together on two projects. The firm has all the <br />necessary licenses and insurance to perform the project. <br />Team <br />The team is comprised of the following: <br />Architect: M.C. Harry and Associates, Inc <br />Bridge Supplier: Contech Engineered Solutions, LLC <br />Construction Manager: Lynx Construction Management, LLC <br />MEP Engineer: SDM Consulting Engineers, Inc <br />Structural Engineer: Bliss & Nyitray, Inc <br />Schedule of Proposed Services <br />1 1. Pre - design 14 days <br />a) Survey, site investigation, utility location <br />2. Design <br />a) Schematic Design /Concept Renderings 30 days <br />b) Design Development (30% CD) 30 days <br />c) Contract Documents 90 days <br />3. Permitting 30 days <br />a) Building, DOT, Derm approval <br />4. Construction 120 days <br />Team Projects <br />The following is a sample of the current and previous projects and past experience: <br />All Children's Hospital. St. Petersburg, Florida <br />150 ft glass- enclosed bridge, connecting two hospital buildings <br />American EXnress Reeional Headauarters. Fort Lauderdale, Florida <br />225 ft covered bridge connecting parking garage to office building <br />fL: CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 4 of 66 <br />FL: CMC1250004 NC: 69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 <br />TN: 63012 <br />