Laserfiche WebLink
• inoperable in August. <br /> Pier Park: $1,174.50 for miscellaneous paver repairs in the parking lot that had <br /> not been covered under contracts with the pier reconstruction contractor or <br /> underground utility contractor (potable water). <br /> Intracoastal Park: $2,917.25 for the transport of unused paver cubes to the <br /> Public Works yard left on-site by the Collins Avenue Streetscape contractor <br /> along with the removal and disposal of associated debris. <br /> North Bay Road Drainage: $41,668.00 for the repair and/or replacement of storm <br /> drainage pipe, and relining six manholes at three different locations, being just <br /> north of SR826 and in the vicinity of Gwen Margolis Park . The work also <br /> included reconstruction of the roadway surfaces at each of the three locations. <br /> In FY12/13, a total of $59,128.25 was authorized for services performed by Ric- <br /> Man International, Inc. Allowing for this procurement authority for FY13/14 will <br /> allow for continued and timely response to various problems as they arise. <br /> COST: <br /> None at this time. <br /> 4110 ATTACHMENTS: <br /> • Resolution <br /> • <br /> Agenda Item No I OD <br /> Date 10/17/2013 <br /> 167 <br />