Laserfiche WebLink
I COMPREHENSIVE SITE ANALYSIS I INDEX OF DRAWINGS I <br />COMPREHENSIVE ZONING LEGEND <br />Zoning Designation <br />TCO- Town Center Overlay <br />Occupancy <br />Mixed Use residential & commercial <br />6,377 <br />Flood Zone I Elev. <br />Zone AE <br />+8' -0" NGVO <br />Lot Area <br />Square feet <br />Acres <br />Phase 1 (Existing parcel) <br />126,500 <br />2.904 <br />Phase II (Towers 4 & 5 <br />117,014 <br />2.68 <br />Phase 111 Office tower <br />31,113 <br />0.714 <br />Total <br />274p627 SF. <br />6.304 <br />LOT COVERAGE <br />1 17,569 <br />Required / Allowed <br />Actual I Proposed <br />1 4,064 <br />Max. = 90% <br />Actual = 74% <br />Phasel ExlsOn arcel <br />113,850 <br />99,325 <br />Phase II (Towers 4 8 5 <br />165,312 <br />77,230 <br />Phase III Office tower <br />28,001 <br />27,038 <br />Total <br />247,163 SF. <br />203,593 SF. <br />FLOOR AREA RATIO (FAR) <br />Phase I (Existing parcel) <br />657,800 <br />517,559 <br />Phase II Towers 4&6) <br />608,472 <br />692,526 <br />Phase III Office tower <br />161,786 <br />95,345 <br />Total <br />1,428,058 SF. <br />I 1,305,430 SF, <br />FLOOR AREA RATIO (FAR) Breakdown <br />Phase (Existing parcel) <br />Required / Allowed <br />Actual /Pro osed <br />Base = 3.5 <br />442,750 <br />0 SF <br />Bonus =0.5 <br />63,250 <br />TDR =30% <br />151,800 <br />Residential Tower <br />Total <br />657,800 SF. <br />517,559 SF. <br />Phase 11 (Towers 4 & 5 <br />Required <br />Provided <br />Base =3.5 <br />409,549 <br />0' -0 "" <br />Bonus =0.5 <br />58,507 <br />Pedestal to Tower <br />TDR = 30% <br />140,416 <br />25' -0" <br />Total <br />608,472 SF. <br />692,526 SF. <br />28'-4- <br />Phase III Office tower <br />20'-6' <br />Pedestal to Tower <br />10' -0' <br />Base = 3.5 <br />108,695 <br />20'-6" <br />East <br />Bonus = 0.5 <br />15,556 <br />TDR = 30% <br />37,335 <br />0' -0' <br />15' -0" <br />Total <br />161,786 SF. <br />95,345 SF. <br />46' -0" <br />Overall <br />Floor Area Ratio <br />1,428,058 <br />1519 FAR <br />1,305,430 <br />4.75 FAR <br />Pedestal <br />0' -0" <br />DENSITY <br />0' -0" <br />97.5 Units /acre <br />97.5 Units /acre <br />Phase I (Existing arcel <br />283 Units <br />286 Units <br />Phase 11 iTowe <br />263 <br />1 329 <br />Phase 111 Office tower <br />69 <br />1 0 <br />Total <br />1 615 Units <br />615 Units <br />DENSITY BREAKDOWN <br />1 feet 1 57 feet <br />Required l Allowed <br />Actual Proposed <br />Phase I (Existing parcel) <br />Office Tower <br />1 <br />Base 75 U/A <br />216 <br />' Variance approved per resolution No. 12 -Z -133 <br />•• Variance Re uired for "Pedestal" Setback and'Pedestal to Tower" Setback <br />TDR 30% <br />65 <br />Total <br />283 Units <br />286 Units' <br />Phase II (Towers 4 & 5 <br />Residential <br />Base = 75 U/A <br />202 <br />Commercial <br />TOR 30% <br />61 <br />Total <br />Total <br />263 Units <br />329 Units' <br />Phase III Office tower <br />Residential <br />Base = 75 U/A <br />53 Units <br />Commercial <br />Total <br />TDR 30% <br />16 <br />Phase III Office tower <br />Total <br />69 Units <br />0 Units <br />Overall Density <br />615 Units <br />615 Units <br />`Total 69 units from Phase III - Transfer 66 Units to Phase II and transfer 3 <br />Units to existing Phase I. <br />Calculation of number of units to be purchased <br />Units proposed <br />615 <br />281 Spaces <br />(55 Tandem @ 19 %) <br />Less all Base Transfer <br />476 <br />1,437 Spaces <br />Sub -total <br />139 <br />LOADING SPACE BREAKDOWN <br />Less St Tropez Ph 1 <br />TDR <br />65 <br />Actual I Propose d <br />Sub -total <br />74 <br />Less units in private <br />bank and previously <br />purchased <br />29 <br />4 spaces 10 x 25 <br />Total units to be <br />purchased <br />45 <br />1 s ace 10 x 25 <br />Phase II Towers 4 &5) <br />GROUND LEVEL COMMERCIAL <br />FOR THE PROPOSED CONDOMINIUM TOWERS TO PERMIT A <br />Minimum = 70% <br />Actual <br />Phase I (Exiialing parcel <br />6,377 <br />33,205 <br />Phase II owers 4&5) <br />6,162 <br />8,329 <br />Phase III Office tower <br />2,001 <br />1 5,326 <br />Total 1 <br />14,540 SF. <br />1 46,860 SF. <br />LANDSCAPE OPEN SPACE <br />SCHEMATIC BUILDING ELEVATIONS <br />Minimum 10% <br />Actual = 14.6% <br />Phase Existin arcel <br />12.650 <br />18,575 <br />Phase II (Tower s 4 & 5 <br />11,701 <br />1 17,569 <br />Phase III Office tower <br />3,111 <br />1 4,064 <br />Total 1 <br />27,462 SF. <br />1 40,209 SF. <br />BUILDING HEIGHT <br />Required I Allowed <br />Actual I Proposed <br />Phase I (Existing parcel) <br />Max. height 290 ft. along <br />Sunny Isles Blvd. - Max. <br />height ft ft Overall <br />Collins <br />average height = 200 ft. <br />2 Towers @ 200 ft. <br />1 Tower 190 ft. <br />Phase 11 (Towers 4 & 5) <br />Phase III Office towerL <br />1 Tower @ 280 ft. <br />1 Tower a 152 ft. <br />Total <br />200 feet <br />Vera a 214.16 feet" <br />PERCENTAGE OF USE IN DEVELOPMENT <br />Project Gross <br />Floor Area• <br />Condominium <br />Floor Area <br />Office / Retail <br />Floor Area <br />Phase 1 <br />(Existing parcel) <br />886,806 SF <br />517,559 SF <br />28,570 SF <br />Phase 11 <br />Towers 4 & 5 <br />803,092 SF <br />692,526 SF <br />8,329 SF <br />hase III <br />Office lower <br />102,169 SF <br />0 SF <br />82,802 SF <br />Percentage of Condominium apace = 67.5% <br />Percentage of Office and Retail space = 6.67% <br />'Gross floor area as define in the Land Development Regulations <br />" Variance required for 'Avera a Building Hei hC <br />SETBACK of <br />Residential Tower <br />Office Tower <br />North <br />Required <br />Required <br />Provided <br />Pedestal <br />15' -0' <br />0' -0 "" <br />15' -0" <br />15' -3" <br />Pedestal to Tower <br />25' -0" <br />17' -7 -" <br />25' -0" <br />20' -0" <br />South <br />Pedestal <br />0' -0" <br />28'-4- <br />0' 1" <br />20'-6' <br />Pedestal to Tower <br />10' -0' <br />56'-4- <br />10' -0" <br />20'-6" <br />East <br />Pedestal <br />0' -0" <br />0' -0' <br />15' -0" <br />15'-6" <br />Pedestal to Tower <br />25' -0" <br />46' -0" <br />20' -0" <br />20'-6" <br />West <br />Pedestal <br />0' -0" <br />T -0" 1 <br />0' -0" <br />1 0' -0" <br />Pedestal to Tower <br />20' -0' 1 <br />20' -5" 1 <br />25' -0' <br />1 28' -8" <br />BUILDING SEPARATION <br />Residential Tower <br />Office Tower <br />Required Provided <br />Re uired I Provided <br />50 feet 128 feet 1 <br />1 feet 1 57 feet <br />BUILDING WIDTH <br />Residential Tower <br />Office Tower <br />1 <br />200 ft. allowed <br />Tower 4 =170 ft. <br />200 ft. allowed <br />Office. Tower =107 ft. <br />' Variance approved per resolution No. 12 -Z -133 <br />•• Variance Re uired for "Pedestal" Setback and'Pedestal to Tower" Setback <br />PARKING BREAKDOWN <br />Required / Allowed <br />Actual I Proposed <br />Phase I (Existing parcel) <br />Residential <br />343 <br />343 <br />Commercial <br />135 <br />135 <br />Total <br />478 Spaces Allowed * <br />476 Spaces Actual' <br />Phase II Towers 4 & 5 <br />Residential <br />582 <br />642 <br />Commercial <br />Total <br />36 <br />618 Spaces <br />36 <br />678 Spaces <br />(85 Tandem @ 14 %) <br />Phase III Office tower <br />Office <br />258 <br />259 <br />Commercial <br />22 <br />22 <br />Total <br />280 Spaces <br />281 Spaces <br />(55 Tandem @ 19 %) <br />Overall parking <br />1,376 Spaces <br />1,437 Spaces <br />'Parking buy down 15.1% (8 spaces under resolution 05 -Z -9 <br />LOADING SPACE BREAKDOWN <br />Required l Allowed <br />Actual I Propose d <br />Phase I (Existing parcel) <br />Residential <br />4 spaces 10 x 25 <br />4 spaces 10 x 25 <br />Commercial <br />1 s ace 10 x 25 <br />1 s ace 10 x 25 <br />Phase II Towers 4 &5) <br />Residential <br />2 spaces 10 x 25 <br />2 spaces 10 x 25 <br />Commercial <br />2 spaces 10 x 25 <br />2 spews 10 x 25 <br />Phase III Office tower <br />Office <br />1saces 10x25 <br />Isaces 10 x25 <br />Corrini <br />1 spaces 10 x 25 <br />1 spaces 10 x 25 <br />Total <br />10 Spaces <br />10 Spaces <br />SUMMARY OF VARIANCE REQUEST <br />01) VARIANCE ON NORTH EDGE "PEDESTAL -TO- TOWER" <br />SETBACK FOR THE PROPOSED OFFICE TOWER TO PERMIT A <br />SETBACK OF 20' -0" (25' -0" REQUIRED ALONG SUNNY ISLES <br />BEACH BLVD.) -A VARIANCE OF V -0 ". <br />02) VARIANCE OF 14.16' FROM THE AVERAGE HEIGHT <br />RESTRICTION CONTAINED IN SECTION 267 -37 F.9(A) (1) OF <br />THE LDRs. <br />'a. <br />01 <br />GENERAL NOTES <br />01) REFER TO BOUNDARY SURVEY PREPARED BY MARIO <br />PRATS JR. & ASSOCIATES, INC. <br />02) EXISTING SITE CONDITIONS RELATED TO AND /OR <br />AFFECTED BY THE PROPOSED PROJECT AND /OR NEW WORK <br />WAS TAKEN FROM GENERAL OBSERVATIONS DURING SITE <br />VISITS AND THE BEST AVAILABLE DATA. ALL INFORMATION <br />RELATED TO EXISTING BUILDING AREAS, HEIGHT AND /OR <br />EXISTING SITE INFORMATION & LAYOUT, AS SHOWN AND /OR <br />NOTED IN THE ZONING DATA, SITE PLANS, AND IN THIS SET <br />OF DOCUMENTS, IS OBTAINED FROM THE ABOVE <br />REFERENCE SURVEY AND /OR PROVIDED BY THE OWNER. <br />THE ARCHITECT ASSUMES NO RESPONSIBILITY FOR THE <br />ACCURACY OF THE INFORMATION PROVIDED BY OTHERS. <br />COVER SHEET <br />SURVEY- THREE(3)SHEETS <br />A -100 INDEX OF DRAWINGS <br />COMPREHENSIVE SITE ANALYSIS <br />A -101 SITE AERIAL PHOTO <br />COMPREHENSIVE SITE ELEVATION <br />A -102 COMPREHENSIVE SITE PLAN <br />ENLARGED PLAN OF SUNNY ISLES BLVD FRONTAGE <br />A -200 BUILDING DATA / UNIT & AREA TABULATION <br />A -200.1 PHASE II SITE PLAN / SITE SECTION DIAGRAMS <br />A -201 GROUND LEVEL PLAN <br />A -202 2nd LEVEL PLAN (PARKING) <br />A -203 3rd THROUGH 4th LEVEL PLAN (PARKING) <br />A -204 MEZZANINE LEVEL PLAN (PARKING) <br />A -205 5th LEVEL PLAN (LANAI) <br />A -206 TOWERS IV & V TYP. LEVEL PLANS / PENTHOUSE LEVEL PLANS <br />A -207 TOWER IV (EAST) - ENLARGED TYPICAL FLOOR PLAN <br />A -208 TOWER V (WEST) - ENLARGED TYPICAL FLOOR PLAN <br />A -208.1 TYPICAL ENLARGED PENTHOUSE FLOOR PLAN <br />A -208.2 TYPICAL ENLARGED TOWER SUITE FLOOR PLAN <br />A -208.3 TYPICAL ROOF PLAN / TOWER SUITE CABANA FLOOR PLAN <br />A -209 SCHEMATIC BUILDING ELEVATIONS <br />A -210 SCHEMATIC BUILDING SECTION (NORTH - SOUTH) <br />A -211 SCHEMATIC BUILDING SECTION (EAST - WEST) <br />LP -200 GROUND LEVEL PLANTING PLAN / PLANT LIST <br />LP -201 LANAI LEVEL PLANTING PLAN / SPECIFICATIONS / DETAILS! <br />PLANT LIST / NOTES <br />PHASE 111 - OFFICE BUILDING <br />A -300 <br />FOR THE PROPOSED CONDOMINIUM TOWERS TO PERMIT A <br />SETBACK OF 0'4" (15'4" REQUIRED ALONG SUNNY ISLES <br />A -301 <br />BEACH BLVD.) -A VARIANCE OF 15' -0 ". <br />04) VARIANCE ON THE "PEDESTAL TO TOWER" SETBACK FO <br />A -302 <br />THE PROPOSED CONDOMINIUM TOWERS TO PERMIT A <br />J( <br />SETBACK 17' -7" (20'4" REQUIRED ALONG SUNNY ISLES <br />A -304 <br />BEACH BLVD.) - A VARIANCE OF T -5 ". <br />'a. <br />01 <br />GENERAL NOTES <br />01) REFER TO BOUNDARY SURVEY PREPARED BY MARIO <br />PRATS JR. & ASSOCIATES, INC. <br />02) EXISTING SITE CONDITIONS RELATED TO AND /OR <br />AFFECTED BY THE PROPOSED PROJECT AND /OR NEW WORK <br />WAS TAKEN FROM GENERAL OBSERVATIONS DURING SITE <br />VISITS AND THE BEST AVAILABLE DATA. ALL INFORMATION <br />RELATED TO EXISTING BUILDING AREAS, HEIGHT AND /OR <br />EXISTING SITE INFORMATION & LAYOUT, AS SHOWN AND /OR <br />NOTED IN THE ZONING DATA, SITE PLANS, AND IN THIS SET <br />OF DOCUMENTS, IS OBTAINED FROM THE ABOVE <br />REFERENCE SURVEY AND /OR PROVIDED BY THE OWNER. <br />THE ARCHITECT ASSUMES NO RESPONSIBILITY FOR THE <br />ACCURACY OF THE INFORMATION PROVIDED BY OTHERS. <br />COVER SHEET <br />SURVEY- THREE(3)SHEETS <br />A -100 INDEX OF DRAWINGS <br />COMPREHENSIVE SITE ANALYSIS <br />A -101 SITE AERIAL PHOTO <br />COMPREHENSIVE SITE ELEVATION <br />A -102 COMPREHENSIVE SITE PLAN <br />ENLARGED PLAN OF SUNNY ISLES BLVD FRONTAGE <br />A -200 BUILDING DATA / UNIT & AREA TABULATION <br />A -200.1 PHASE II SITE PLAN / SITE SECTION DIAGRAMS <br />A -201 GROUND LEVEL PLAN <br />A -202 2nd LEVEL PLAN (PARKING) <br />A -203 3rd THROUGH 4th LEVEL PLAN (PARKING) <br />A -204 MEZZANINE LEVEL PLAN (PARKING) <br />A -205 5th LEVEL PLAN (LANAI) <br />A -206 TOWERS IV & V TYP. LEVEL PLANS / PENTHOUSE LEVEL PLANS <br />A -207 TOWER IV (EAST) - ENLARGED TYPICAL FLOOR PLAN <br />A -208 TOWER V (WEST) - ENLARGED TYPICAL FLOOR PLAN <br />A -208.1 TYPICAL ENLARGED PENTHOUSE FLOOR PLAN <br />A -208.2 TYPICAL ENLARGED TOWER SUITE FLOOR PLAN <br />A -208.3 TYPICAL ROOF PLAN / TOWER SUITE CABANA FLOOR PLAN <br />A -209 SCHEMATIC BUILDING ELEVATIONS <br />A -210 SCHEMATIC BUILDING SECTION (NORTH - SOUTH) <br />A -211 SCHEMATIC BUILDING SECTION (EAST - WEST) <br />LP -200 GROUND LEVEL PLANTING PLAN / PLANT LIST <br />LP -201 LANAI LEVEL PLANTING PLAN / SPECIFICATIONS / DETAILS! <br />PLANT LIST / NOTES <br />PHASE 111 - OFFICE BUILDING <br />A -300 <br />BUILDING DATA / UNIT & AREA TABULATION <br />SITE PLAN / SITE SECTION DIAGRAMS <br />A -301 <br />GROUND LEVEL PLAN <br />A -302 <br />2nd LEVEL PLAN (PARKING) <br />A -303 <br />3rd THROUGH 4th LEVEL PLAN (PARKING) <br />A -304 <br />5th LEVEL PLAN (PARKING / OFFICE) <br />A -305 <br />LANAI LEVEL PLAN (PARKING) <br />A -306 <br />TYPICAL OFFICE LEVEL PLAN <br />A -307 <br />SCHEMATIC BUILDING ELEVATIONS <br />A -308 <br />SCHEMATIC BUILDING SECTION (EAST - WEST) <br />LP -300 <br />GROUND LEVEL & LANAI LEVEL PLANTING PLANS / <br />PLANT LIST <br />LANDSCAPE <br />LP -100 OVERALL SITE PLAN <br />LP -101 SHORELINE PLANTING PLAN (TOWER V - WEST) <br />LP -102 SHORELINE PLANTING PLAN (TOWER IV - EAST) <br />LP -103 SHORELINE PLANTING PLAN (OFFICE TOWER) <br />LP -201 SHORELINE ACCESSORIES PLAN (TOWER V - WEST) <br />LP -202 SHORELINE ACCESSORIES PLAN (TOWER IV -EAST) <br />LP -203 SHORELINE ACCESSORIES PLAN (OFFICE TOWER) <br />LP -301 SHORELINE LIGHTING PLAN (TOWER V - WEST) <br />LP -302 SHORELINE LIGHTING PLAN (TOWER IV - EAST) <br />LP -303 SHORELINE LIGHTING PLAN (OFFICE TOWER) <br />LP -401 SHORELINE PAVING PLAN (TOWER V - WEST) <br />LP -402 SHORELINE PAVING PLAN (TOWER IV - EAST) <br />LP -403 SHORELINE PAVING PLAN (OFFICE TOWER) <br />LP -501 SHORELINE ACCESSORIES PHOTOS <br />LP -502 SHORELINE ACCESSORIES PHOTOS <br />SITE PLAN RE- SUBMITTAL <br />REFER TO CLOUDED AREAS FOR CHANGES TO PREVIOUSLY APPROVED SUBMITTAL UNDER RESOLUTION NO. 12 -Z -133 DATED 11.15.12 <br />axioma 31nc. <br />7418 S.W. 48th St. <br />Miami, Florida 33155 <br />USA <br />305.667.6333 <br />r, 305.667.6670 <br />edc @axi ma3.w <br />6 -xiorra3.com <br />CLIENT -ER: <br />J. MILTON AND ASSOCIATES <br />3211 PONCE DE LEON BLVD. <br />CORAL GABLES, FL 33143 <br />08.305.460.6300 <br />PROJECTNAME: <br />PHASE II - CONDOMINIUM TOWER IV & V <br />PHASE III -OFFICE BUILDING <br />SUNNY ISLES BEACH. FLORIDA <br />consuLTarlrs: <br />1 c <br />' r/) o <br />J� J p <br />landscape architecture <br />REVISIONS <br />AOFFICE TOWER PARCEL <br />BLDG. HOT. DESIGN REVISION <br />RE- SUBMITTAL 08.01.13 <br />01 CONDO TOWER PARCEL <br />STAFF REV. COMMENTS <br />OF 08.13.13 <br />DATE: 09.26.13 <br />or <br />OCT 072013 <br />Corporate No: AA0002273 <br />Eduardo Castlnelra, AIA AR14049 <br />INDEX OF DRAWINGS / <br />COMPREHENSIVE SITE <br />ANALYSIS <br />SCALE: AS SHOWN <br />A -100 <br />