My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2152
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2152
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2013 3:46:40 PM
Creation date
11/26/2013 1:32:47 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2152
Date (mm/dd/yyyy)
11/21/2013
Description
Agmt w/RJ Behar: Design-Criteria for Pedestrian Overpass Bridge @ Gateway Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R.J.Behar & Company, Inc. <br />Engineers- P l a n n e r s <br />Consultant Work Order Proposal — City of Sunny Isles Beach <br />Design -Build Criteria Package for Gateway Park Pedestrian Bridge <br />R J Behar & Company, Inc. proposes to provide engineering services for the <br />development of Design -Build (DB) Criteria Package to be used by prospective design - <br />Builders bidding on the Gateway Park Pedestrian Bridge; pursuant to its Professional <br />Service Agreement with the City of Sunny Isles Beach, Florida. <br />I. PROJECT DESCRIPTION: <br />The City intends to issue a DB contract to a prequalified DB firm for services related to <br />the construction of a pedestrian bridge over the westbound ramp of State Road 826 (aka <br />Sunny Isles Boulevard) to connect a parcel of City Owned property that lies between the <br />eastbound and westbound ramps to SR 826. This project will provide pedestrian access <br />from north to proposed Gateway Park expected to commence construction in 2013. The <br />development of the DB Criteria Package will require close coordination with the <br />architect for Gateway Park and will include the following: <br />II. SCOPE OF WORK: <br />1.1 Data Gathering / Field Visit <br />This task will include conducting a site visit, obtaining and <br />reviewing existing right of way and utility information, reviewing <br />MOT requirements, identifying permit requirements, etc. <br />1.2 Alternative Analysis <br />This task will include evaluation of possible bridge delivery <br />options i.e. prefabricated vs. engineered bridge construction based <br />on required bridge length vertical and horizontal clearance <br />requirements and aesthetic considerations. <br />1.3 Draft DB Criteria Package <br />Once the information is compiled and general feasibility has been <br />assessed, a draft report will be prepared for review with the City of <br />Sunny Isles Beach for further input and to determine whether any <br />more information may need to be gathered. <br />1.4 Bridge Structural Concept <br />Conceptual plans will be developed identifying structural <br />component requirements based on all applicable criteria and the <br />results of task 1.2. The schematic concept plan will be an appendix <br />to the DB Criteria Package. <br />Work Order Proposal DB Criteria Package for Pedestrian Bridge <br />City of Sunny Isles Beach Page 1 of 3 <br />ATTACHMENT "A" <br />
The URL can be used to link to this page
Your browser does not support the video tag.