Laserfiche WebLink
SECOND. AMENDMENT TO THE DESIGN -BUILD <br />.;{.• AGREEMENT BETWEEN THE CITY OF SUNNY ISLES <br />BEACH AND 4M INVESTORS LLC <br />This Second Amendment to the Design -Build Agreement for Pal and Parking Garage between <br />the City of Sunny Isles Beach and 4M Investors, LLC. executed this 3p day of InM& 2012, is <br />I made a part of the original Design -Build Agreement for Park and Parking Garage (the "Agreement ") <br />between the parties dated July 21, 2011, between the City of Sunny Isles Beach ( "City ") and 4M <br />Investors, LLC. ( "Contractor') a Florida Limited Liability. Company. The City and Contractor hereby <br />agree as follows: <br />RECITALS <br />WHEREAS, the City desires to include additional amenities to the project consisting of the total <br />and complete design and construction of a park and a three 'hundred and eight (308) space parking garage <br />consistent with the structural design and aesthetic standards of the City owned garage located at Heritage <br />Park, associated landscape, irrigation work, underground drainage system, and as generally described in <br />the revised schematic proposal submitted to the City on February 13, 2012; and <br />WHEREAS, these additional amenities to the project will increase the guaranteed maximum price <br />of the project from Ten Million Seven Hundred Thousand Dollars ($10,700,000.00) to Sixteen Million <br />Five Hundred Thousand Dollars ($16,500,000.00). <br />NOW, THEREFORE, the City and Contractor agree to enter into this Second Amendment to the <br />Agreement in accordance with the terms and conditions stated below. <br />1. PROJECT: Section 1.17 of the Agreement is hereby amended to reflect the Project has been <br />redesigned to be consistent with the revised site plan submitted on February 13, 2012. <br />2. INCREASE IN GUARANTEED MAXIMUM PRICE: Sections 1. 13, 5. 1.1 and 5, 1.3 of the <br />Agreement are hereby amended to reflect that Contractor warrants and guarantees that the <br />maximum price for all the Design -Build Work on.the Project shall not exceed Sixteen Million <br />Five Hundred Thousand Dollars ($16,500,000.00), subject to tax exemption savings, based on the <br />revised Guaranteed Maximum Price Proposal dated March 20, 2012, attached hereto as Exhibit <br />A ". <br />3. TAX SAVINGS AGREEMENT AND CONSTRUCTION FENCE. The City and the <br />Contractor agrees to enter into a tax exemption agreement, attached hereto as Exhibit `B ", <br />whereby certain purchases under the Agreement can be made through the City. Further, <br />Contractor, at its own expense, agrees to install a wood panel construction fence with a mural of <br />the park design on the south side of the Project or Property. <br />4. OTHER PROVISIONS REMAIN IN EFFECT: Except as specifically modified herein, all <br />terms and conditions of the original Agreement between the parties, dated July 21, 2011, shall <br />remain in full force and effect. <br />IN WITNESS WHEREOF, the parties hereto have executed this document as of the date mentioned <br />above. <br />