My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2173
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2173
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2015 3:33:34 PM
Creation date
12/23/2013 2:56:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2173
Date (mm/dd/yyyy)
12/19/2013
Description
Amend & Consent to Assignment Design-Build Agmt:4M Investors & Int’l Gen Contractor
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Alen Cd= <br />Mardi 20, 2012 <br />1 J�j <br />13. Make 'Exotic Planter" a dry planter — no water feature at this location. <br />14. Study and adjust the proximity of the plaza trees to the kids water feature — Avoid leavee <br />from dogging the water jet system. <br />15. Great Lawn shall maintain a constant elevation as originally designed. <br />16. Provide a 30'x80' stage with a 12'x20' back room and* stage floor to be 42" above <br />adjacent walkway flooring. — To be designed for a total budget of $500,000.00 <br />17. Provide landscape lighting fixtures with outlets. <br />18. Provide sufficient electrical panel capacity for other park activities and /or functions <br />19. Do not use lernon or fruit trees on park <br />20. Do not use Sabal palms and make landscaping budget an allowance in order to <br />determine the specific tree species a la{er Ume - U is preferred to use a variety of trees <br />similar to Pa- irchild Garden. <br />21. Provide three (3) flag poles at the northeast comer of the site. <br />22. Slope top of crash wall to avoid kids form walking on surface. <br />23. All three (3) Kids Play Equipment apparatus to remain as originally designed. <br />24. Leave Kids Water Court and the Water Wail. <br />25. Leave the Playground Cover for three apparatus. <br />28.40i Level Banquet, Hall and Restaurant will not be included as part of the scope of work. <br />27. Provide a HC restroom for the stage back room. <br />Note: Due to the fact that at this time there is no soil report or structural engineer design, we <br />wM maintain a structural slab Inside the storage room. Once we engage in the Design <br />�.� Deveopment Phase and this Issue is further reviewed we can make a better assessment on <br />k <br />what type of slab better suits the project and achieves the target budget. The cost for a non - <br />structural floating slab is estimated at $20.00 SF (Including the fill required to achieve the same <br />level of the building ground floor slab). <br />Please keep in mind that many of these items are of a technical nature that will be incorporate in <br />the project documents during the Design Development and Construction Document Phase, <br />therefore they are not reflected on the Site Plan Approval documents at this Ume. <br />i <br />Summary of Total Project Costs <br />Parking Structure Contract = $10,000,000.00 <br />Additional Items to Parking Structure under contract dated 7/21111 submitted for <br />approval: <br />Foundation Improvements for 41h Level Construction: $ 490,000.00 <br />Park Improvements 00,000 SF Site) _ $ 3,734,321.00 <br />Pedestrian Bridge and Towers = $ 2,217,941.00 <br />Performance Stage = $ 500.000.00 <br />Total = $ 6,042,262.00 <br />Less Fire sprinkler credit (2 floors) _ ($ 100.000.001 <br />Adivatad Total = $ 8,842,262.00 <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.