My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2173
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2173
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2015 3:33:34 PM
Creation date
12/23/2013 2:56:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2173
Date (mm/dd/yyyy)
12/19/2013
Description
Amend & Consent to Assignment Design-Build Agmt:4M Investors & Int’l Gen Contractor
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notes: <br />01- Estimated project costs does not include the following: <br />Land acqulsition cost. <br />Testing fees. <br />City / Agency fees. <br />Relocation of ewsting elect. poles. <br />Upgrades to existing utilities. <br />Environmental related Issues and/or work. <br />Demolition of existing structures, utillties, underground constructions, etc. <br />02- Costs are subject to change based on final program, design and/or site conditions. <br />Page 2 u12 <br />Park Cost Estimate Summary <br />No. <br />Item Description <br />Units <br />Cost! Unit <br />Total <br />Remarks <br />M,wN oe.�cn.vee <br />12000 <br />FURNISHINGS <br />Not Applicable <br />1 01 <br />1 <br />1 000 <br />13000 <br />SPECIAL CONSTRUCTIONS <br />Prefabricated Metal Bridge (Painted) <br />130 <br />LF <br />2,200.00 <br />286,000.00 <br />Albwance <br />14000 <br />CONVEYING SYSTEMS <br />Elevators <br />2 <br />UN <br />85,000.00 <br />170,000.00 <br />15000 <br />MECHANICAL <br />Not Applicable <br />000 <br />16000 <br />ELECTRICAL <br />Electrical work! Panels <br />1 <br />UN <br />80,000.00 <br />80,000.00 <br />Lighting <br />1 <br />UN I <br />100,000.00 <br />100,000.00 <br />Asaeanoe <br />SUB -TOTAL <br />$1,663,OOD.00 <br />Contingency <br />General Conditions <br />Gen. Liability Insurance <br />GC Overhead / Fee <br />$41,575.00 <br />$170,457.50 <br />$26,250.46 <br />$95,064.15 <br />TOTAL HARD COST <br />$1,996,347.10 <br />ArE & Consultants Professional Fees <br />Letter of Credit <br />$199,634.71 <br />$21,959.82 <br />PROJECT TOTAL <br />$2,217,941.63 <br />Notes: <br />01- Estimated project costs does not include the following: <br />Land acqulsition cost. <br />Testing fees. <br />City / Agency fees. <br />Relocation of ewsting elect. poles. <br />Upgrades to existing utilities. <br />Environmental related Issues and/or work. <br />Demolition of existing structures, utillties, underground constructions, etc. <br />02- Costs are subject to change based on final program, design and/or site conditions. <br />Page 2 u12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.