Laserfiche WebLink
Notes: <br />01- Estimated project costs does not include the following: <br />Land acquisition cost. <br />Sound System Design / Installation / Equipment <br />Testing fees. <br />City /Agency fees. <br />Relocation of existing elect. poles. <br />Upgrades to existing utilities. <br />Environmental related issues and/or work. <br />Demolition of existing structures, utilities, underground constructions, etc. <br />02- Costs are subject to change based on final program, design and /or site condlllons. <br />Page 2 of 2 <br />Park Cost Estimate Summary <br />(Incorporates City Requirements of 312/12; 3/9/12 and 3115112) <br />`Noe <br />Item Description <br />uN�n <br />Cost I Unit <br />Total <br />Remarks <br />12000 <br />FURNISHINGS <br />Not Applicable <br />000 <br />13000 <br />SPECIAL CONSTRUCTIONS <br />Not Applicable <br />000 <br />14000 <br />CONVEYING SYSTEMS <br />Not Applicable <br />000 <br />15000 <br />MECHANICAL <br />A/C System (Installed) <br />1 <br />UN 1 <br />10,000.00 <br />10,000.00 <br />HC Restroom at badaoom <br />1 <br />UN 1 <br />19,800.00 <br />19,800.00 <br />�dl er &sewer <br />16000 <br />ELECTRICAL <br />Electrical work / Panels <br />1 <br />UN <br />40,000.00 <br />40,000.00 <br />Lighting <br />t I <br />UN 1 <br />60,000.00 <br />60,000.00 <br />Allowance <br />SUB -TOTAL <br />$375,400.00 <br />Contingency <br />General Conditions <br />Gen. Liability Insurance <br />GC Overhead / Fee <br />$9,385.00 <br />$38.478.50 <br />$5,925.69 <br />$21,459.46 <br />TOTAL HARD COST <br />$450,648.65 <br />A/E 8 Consultants Professional Fees <br />Letter of Credit <br />$45,084,68 <br />$4,957.14 <br />PROJECT TOTAL <br />$500,670.65 <br />ROUNDED PROJECT TOTAL <br />$500,000.00 <br />Notes: <br />01- Estimated project costs does not include the following: <br />Land acquisition cost. <br />Sound System Design / Installation / Equipment <br />Testing fees. <br />City /Agency fees. <br />Relocation of existing elect. poles. <br />Upgrades to existing utilities. <br />Environmental related issues and/or work. <br />Demolition of existing structures, utilities, underground constructions, etc. <br />02- Costs are subject to change based on final program, design and /or site condlllons. <br />Page 2 of 2 <br />