My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2173
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2173
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2015 3:33:34 PM
Creation date
12/23/2013 2:56:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2173
Date (mm/dd/yyyy)
12/19/2013
Description
Amend & Consent to Assignment Design-Build Agmt:4M Investors & Int’l Gen Contractor
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notes: <br />01- Estimated project costs does not include the following: <br />Land acquisition cost. <br />Sound System Design / Installation / Equipment <br />Testing fees. <br />City /Agency fees. <br />Relocation of existing elect. poles. <br />Upgrades to existing utilities. <br />Environmental related issues and/or work. <br />Demolition of existing structures, utilities, underground constructions, etc. <br />02- Costs are subject to change based on final program, design and /or site condlllons. <br />Page 2 of 2 <br />Park Cost Estimate Summary <br />(Incorporates City Requirements of 312/12; 3/9/12 and 3115112) <br />`Noe <br />Item Description <br />uN�n <br />Cost I Unit <br />Total <br />Remarks <br />12000 <br />FURNISHINGS <br />Not Applicable <br />000 <br />13000 <br />SPECIAL CONSTRUCTIONS <br />Not Applicable <br />000 <br />14000 <br />CONVEYING SYSTEMS <br />Not Applicable <br />000 <br />15000 <br />MECHANICAL <br />A/C System (Installed) <br />1 <br />UN 1 <br />10,000.00 <br />10,000.00 <br />HC Restroom at badaoom <br />1 <br />UN 1 <br />19,800.00 <br />19,800.00 <br />�dl er &sewer <br />16000 <br />ELECTRICAL <br />Electrical work / Panels <br />1 <br />UN <br />40,000.00 <br />40,000.00 <br />Lighting <br />t I <br />UN 1 <br />60,000.00 <br />60,000.00 <br />Allowance <br />SUB -TOTAL <br />$375,400.00 <br />Contingency <br />General Conditions <br />Gen. Liability Insurance <br />GC Overhead / Fee <br />$9,385.00 <br />$38.478.50 <br />$5,925.69 <br />$21,459.46 <br />TOTAL HARD COST <br />$450,648.65 <br />A/E 8 Consultants Professional Fees <br />Letter of Credit <br />$45,084,68 <br />$4,957.14 <br />PROJECT TOTAL <br />$500,670.65 <br />ROUNDED PROJECT TOTAL <br />$500,000.00 <br />Notes: <br />01- Estimated project costs does not include the following: <br />Land acquisition cost. <br />Sound System Design / Installation / Equipment <br />Testing fees. <br />City /Agency fees. <br />Relocation of existing elect. poles. <br />Upgrades to existing utilities. <br />Environmental related issues and/or work. <br />Demolition of existing structures, utilities, underground constructions, etc. <br />02- Costs are subject to change based on final program, design and /or site condlllons. <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.