My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2173
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2173
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2015 3:33:34 PM
Creation date
12/23/2013 2:56:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2173
Date (mm/dd/yyyy)
12/19/2013
Description
Amend & Consent to Assignment Design-Build Agmt:4M Investors & Int’l Gen Contractor
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 1- DEFINITIONS ARTICLE 1- DEFI[NMONS <br />Wherever used in this Agreement or in the other Contract Documents the following tams <br />have the meanin gs indicated which are applicable to both the singular and plural thereof: <br />1.1 - the written agreement between the CITY and CONTRACTOR <br />covering the Warr to be performed including other Contract Documents that are attached to the <br />Agreement or made a part thereof. <br />1.2 Building Department - The Building Department of the CITY of Sunny Isles Bead, <br />Florida, or its authorized employees. <br />1.3 Change Order - A document which is signed by the CONTRACTOR and CITY, <br />through its duly designated and formally authorized agent, which authorizes the performance of the <br />Extra Wodc. The CONTRACTOR shall not perform Extra Work of any kind, however <br />chaiactenzed, for which it expects to claim additional compensation without written authorization <br />from the CITY. If the CITY authorizes the CONTRACTOR to perform Extra Work, then prior to <br />performing the Extra Work, the CITY and CONTRACTOR shall enter into a written Change Order <br />specifying the services or work to be performed, the additional Contract Time that may be required <br />and the compensation to be paid for this Extra Wodc. Any Extra Work performed by the <br />CONTRACTOR without the CITY'S prior written approval shall not be compensable, without <br />except ion. The CONTRACTOR intentionally, knowingly and voluntarily waives any claim for <br />unjust enrichment or quantum merit with respect to any work performed in the absence of a written <br />Change Order. Any waiver of this provision must be in writing and signed by both Parties and in no <br />event shall such written waiver extend to any subsequent event. <br />L4 CITY - The CITY Commission of the CITY of Sunny Isles Beach, Florida and its <br />designated official authorized to provide approval or consent with respect to this Agreement. <br />1.5 City Manager- City Manager of the City of Sunny Isles Beach or his designee. <br />1.6 Conned Documents - The Contract Documents consist of the Drawings, Plans and <br />Specifications, Non - Collusive Affidavit, Public Entity Crimes Form, this Agreement, Notice of <br />Award, Notice to Proceed, Certificate(s) of InsUrnnCe. Payment and Performance Bonds and any <br />additional documents which are required to be submitted under this Agreement, and all Written <br />Amendments and Change Orders issued on or after the effective date of the Contract- <br />1.7 Defective - An adjective which when modifying the Wodc refers to Work that is <br />defective under Applicable Building Codes and General Industry Standards, faulty or deficient, or <br />does not conform to the Contract Documents, or does not meet the requirements of any inspection, <br />reference standard, test or approval referred to in the Contract Documents, or has been damaged <br />prior to final payment- <br />1.8 Design -Build Work – Shall be defined to include Park and Paddng Garage, all <br />design services associated with and/or necessary to timely constmct the code compliant Project and <br />construction services associated with and/or necessary to timely complete the Project within the <br />Guaranteed Maximum Price, including, but not limited to, all site related work without limitation, <br />SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.