My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2173
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2173
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2015 3:33:34 PM
Creation date
12/23/2013 2:56:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2173
Date (mm/dd/yyyy)
12/19/2013
Description
Amend & Consent to Assignment Design-Build Agmt:4M Investors & Int’l Gen Contractor
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pre- approval related to the permitting process that the plans will be required to undergo with the <br />Building Department. <br />6.4.1.6 CONTRACTOR shall prepare and submit for review to the Cr1'Y an <br />"Issued for Construction" design package, which necessarily includes Plans and Specifications, that <br />the CONTRACTOR is obligated to produce to the complete satisfaction of the CITY which is <br />deemed one hundred percent (100%) complete for the construction of the entire Project, which are <br />signed and sealed by a Florida Licensed Engineer and which are sufficient to secure a permit for the <br />construction of the entire Project. The CITY shall not make any changes to the Plans and <br />Specifications at 100% percent design if CONTRACTOR satisfies all comments made by the CffY <br />at 90% percent design.The CITY'S review of the design plans shall not be deemed an acceptance of <br />the plans nor be deemed a pre- approval related to the permitting process that the plans will be <br />required to undergo with the Building Department. The construction phase of the Project shall not <br />commence until the Building Department has issued a permit based on the 100% "Issued for <br />Construction" design package. <br />6.4.2 Once the 100% completed "Issued for Construction" design package has received a <br />permit from the Building Department to commence construction, these Drawings and <br />Specifications shal l then be considered part of the Contract Documents. <br />6.4.3 The CONTRACTOR agrees that any and all revisions that the Building Department <br />may require to the "Issued for Construction" Drawings and Specifications shall be the responsibility <br />of the CONTRACTOR and be so revised at the sole and exclusive cost of the CONTRACTOR and <br />be deemed part of the Guaranteed Maximum Price. <br />6.4.4 The CONTRACTOR shall provide to CrI'Y three (3) record sets and three (3) <br />working sets of full size prints of the Drawings and Specifications. CONTRACTOR shall signify, <br />by affixing an endorsement (seal/signature, as appropriate) on every sheet of the record set, that the <br />Work shown on the endorsed sheets was produced by CONTRACTOR. With the record set of <br />prints, CONTRACTOR shall submit a final set of approved design computations to the CITY. The <br />computations shall be bound in an S 1/2" by I V format and shall be endorsed (seallsignature as <br />appropriate) by CONTRACTOR. <br />6.4.5 All final design documents, plans, reports, studies and other data prepared by <br />CONTRACTOR shall bear the endorsement of a person duly registered in the appropriate <br />professional category. Notwithstanding the foregoing, CONTRACTOR agrees to provide at least <br />ten (10) days notice to the City Manager prior to submittal of any plans, or drawings for review by <br />the Building Department. <br />6.5 Liability for use of Work for Intended Purpose. <br />As an inducement for CrrY to enter into this Agreement, CONTRACTOR <br />represents that it has expertise in professional design services and the construction of public <br />constriction projects by qualified and licensed general construction contractors. The <br />CONTRACTOR'S expertise includes estimating the total costs associated with the final completion <br />of an entire design -build job. Such costs associated with the estimation and calculation, include, <br />SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.