My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2195
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 2:38:41 PM
Creation date
2/25/2014 3:51:09 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2195
Date (mm/dd/yyyy)
02/20/2014
Description
3rd Amd to Agmt w/Calvin Giordano for Final Design & Permitting Emergency Bridge
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0. <br />Prepare bid PeduBm including front end <br />docWYents and technical speclficatim& <br />1. Provide electrical wing services to develop a design <br />criteria package to furnish sufficient information for <br />desigdbuild firms to prepare a bad or a response to an <br />agency's request for proposal, or to permit an agency to <br />enter into a negotiated desip4xdN contract. Provide <br />electrical engineering design services for the mlocation of <br />the pa&nwun ed FPL transformer, the primary service, and <br />the secondary services, from the new transformer location to <br />Main No. 1 swing the individual condominiums; to the CT <br />cabinet serving the common spaces; and to the fire pump <br />service entrance controller at the Garage Building. Provide <br />electrical engineering services for the imption of <br />temporary electric service to be furnished as required during <br />the Period required to relocate the pad - mounted FPL <br />transformer and the conversion fi m. temporary electric <br />service to normal utility electric service. <br />II. Professional Government Consaltirig Services <br />A. Building Code dt ADA Compliance Resolution <br />1. Review the bridge plans to ensure compliance with all FBC <br />Codes. <br />2. Manage and coordinate the discussion between all <br />engineering disciplines to ensure the structural portion of the <br />bridge as well as the approaches smears all required 2012 <br />Florida Accessibility Code. <br />I Negotiate on behalf of the City with the stkochnW enginecr <br />to complete the vertical alignment within the confines of the <br />applicable codes. <br />B. Porto Bellagio Site Plan and Flechical Modification <br />Pftc4of9 <br />Noveosber 7-% 2113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.