T
<br />MECHANICAL ABBREVIATIONS
<br />SYMBOL DESCRIPTION
<br />AD ACCESS DOOR
<br />AC AIR CONDITIONING UNIT
<br />AHU AIR HANDLING UNIT
<br />ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION AND
<br />AIR-CONDITIONING ENGINEERS
<br />BHP BRAKE HORSEPOWER
<br />CLNG CEILING
<br />CD CEILING DIFFUSER
<br />CFM CUBIC FEET PER MINUTE
<br />COND CONDENSER/CONDENSATE
<br />CR CEILING REGISTER
<br />CU CONDENSING UNIT
<br />DDT DUAL DUCT TERMINAL
<br />DN DOWN
<br />E/A EXHAUST AIR
<br />EE EXISTING EXHAUST GRILLE
<br />ER EXISTING RETURN GRILLE/REGISTER
<br />ES EXISTING SUPPLY DIFFUSER
<br />EQPM EQUIPMENT
<br />EXH EXHAUST
<br />EXIST EXISTING
<br />FC FLEXIBLE CONNECTION
<br />FCU FAN COIL UNIT
<br />FD FIRE DAMPER
<br />FPB FAN POWERED BOX
<br />HP HORSEPOWER
<br />INSUL INSULATION
<br />LAT LEAVING AIR TEMPERATURE (AT UNIT'S COIL)
<br />O/A OUTSIDE AIR
<br />RS RELOCATED SUPPLY
<br />R/A RETURN AIR
<br />RTU ROOFTOP UNIT
<br />S/A SUPPLY AIR
<br />S/E SMOKE EVAC
<br />SD SMOKE DETECTOR
<br />TB TRANSFER BOOT
<br />TD TRANSFER DUCT
<br />TG TRANSFER GRILLE
<br />TS TRANSFER
<br />U.O.N.UNLESS OTHERWISE NOTED
<br />MECHANICAL LEGEND & SYMBOLS
<br />SYMBOL DESCRIPTION
<br />THERMOSTAT
<br />POINT OF CONNECTION TO EXISTING
<br />DUCTWORK OR PIPING
<br />DOOR UNDERCUT
<br />NEW HVAC ITEM/DUCTWORK
<br />EXISTING HVAC ITEM
<br />EXISTING HVAC ITEM TO BE REMOVED
<br />EXISTING HVAC ITEM TO BE RELOCATED
<br />DUCT WITH CAPPED END
<br />CONCENTRIC REDUCER
<br />ECCENTRIC REDUCER
<br />TRANSITION: RECTANGULAR TO ROUND
<br />SINGLE DUCT VAV TERMINAL UNIT
<br />SINGLE DUCT VAV TERMINAL UNIT WITH
<br />HEATER
<br />FIRE DAMPER
<br />MANUAL VOLUME DAMPER
<br />FIRESTOP PENETRATION
<br />EXISTING OR HIDDEN SUPPLY DIFFUSER
<br />NEW SUPPLY DIFFUSER ARROWS
<br />INDICATE AIR FLOW PATTERN
<br />EXISTING OR HIDDEN EXHAUST/RETURN GRILLE
<br />NEW EXHAUST/RETURN GRILLE
<br />SUPPLY DUCT/OUTSIDE AIR DUCT IN SECTION
<br />RETURN DUCT/EXHAUST DUCT IN SECTION
<br />FLEXIBLE ROUND DUCT
<br />AIRFLOW MEASURING DAMPER
<br />(TAMCO/EBTRON COMBINATION 1500SW)
<br />EXISTING SUPPLY / EXISTING RETURN
<br />AIR TERMINAL DESIGNATOR AIR
<br />TERMINAL (LETTER DESIGNATOR)
<br />AIR FLOW
<br />(CFM)
<br />QUANTITY IN ROOM (IF MORE THAN 1)
<br />OUTSIDE AIR CALCULATIONS SCHEDULE
<br />PER FLORIDA BUILDING CODE MECHANICAL 6TH EDITION (2017) MINIMUM VENTILATION RATES TABLE 403.3.1.1
<br />OCCUPANCY VENTILATION
<br />UNIT TYPE OF OCCUPANCY
<br />FLOOR AREA
<br />(FT²) *
<br />PERSONS PER
<br />1000 FT²
<br />TOTAL
<br />PERSONS
<br /># OF PLUM
<br />FIXTURES CFM/PERSON CFM/FT ²
<br />EXHAUST
<br />AIRFLOW RATE
<br />(CFM / FIXTURE)
<br />CFM
<br />REQUIRED
<br />CFM
<br />PROVIDED
<br />RTU-1
<br />RECEPTION AREA 820 30 2 -5 0.06 -60
<br />CORRIDOR 305 ----0.06 -18
<br />O/A SUB-TOTAL 78 190
<br />RTU-2
<br />MAIN ENTRY LOBBY 2235 10 33 -5 0.06 -299
<br />O/A SUB-TOTAL 299 690
<br />TOILET ROOM 80 --1 --50 - 50
<br /> E/A SUB-TOTAL -75
<br />RTU-3
<br />OFFICE SPACES 575 5 7 -5 0.06 -70
<br />CONFERENCE RMS 300 50 12 -5 0.06 -78
<br />BREAKROOM 220 -3 -7.5 0.18 -62
<br />CORRIDORS 565 ----0.06 -34
<br />STORAGE ROOMS 140 --0.12 -17
<br />O/A SUB-TOTAL 261 550
<br />TOILET ROOMS 590 --11 --50 - 550
<br /> E/A SUB-TOTAL - 550
<br />RTU-4
<br />FITNESS ROOM 1320 40 27 -20 0.06 -620
<br />O/A SUB-TOTAL 620 750
<br />RTU-5
<br />LECTURE CLASSROOM 915 65 25 -7.5 0.06 -243
<br />O/A SUB-TOTAL 243 300
<br />RTU-6
<br />CATERING KITCHEN 1020 --0.7 CFM/FT 2 ----714
<br /> E/A SUB-TOTAL -714 - 4480
<br />RTU-7
<br />LECTURE CLASSROOM 630 65 18 -7.5 0.06 -173
<br />O/A SUB-TOTAL 173 240
<br />AHU-8
<br />MULTIPURPOSE ROOM 3800 120 240 -5 0.06 -1428
<br />CORRIDORS 145 ----0.06 -9
<br />STORAGE ROOMS 190 --0.12 -23
<br />O/A SUB-TOTAL 1460 1875
<br />* NET AREA
<br />NOTE :
<br />NOT ALL SYMBOLS AND ABBREVIATIONS LISTED APPLY TO THIS PROJECT. REFER TO
<br />CONSTRUCTION DOCUMENTS FOR SCOPE OF WORK.
<br />FD
<br />3 A 300
<br />FS
<br />ES ER
<br />AFMD
<br />CODE COMPLIANCE
<br />MECHANICAL WORK SHALL COMPLY WITH THE FOLLOWING STANDARDS & CODES AS APPLICABLE:
<br />2017 FLORIDA BUILDING CODE (6TH EDITION)
<br />2017 FBC MECHANICAL CODE (6TH EDITION)
<br />2017 FLORIDA FIRE PREVENTION CODE, 6TH EDITION (NFPA 1-2015 & NFPA 101-2015)
<br />2015 NFPA 90A -STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS
<br />2015 NFPA 101 -LIFE SAFETY CODE
<br />LATEST ASHRAE STANDARDS
<br />GENERAL NOTES
<br />1.THE WORK THAT IS TO BE DONE UNDER THIS HEADING INCLUDES THE FURNISHING OF ALL LABOR,
<br />MATERIALS AND EQUIPMENT, PERMITS, FEES, INSPECTIONS, TEST, INSURANCE, ETC., REQUIRED FOR THE
<br />COMPLETION OF THE WORK SHOWN ON DRAWINGS OR LISTED HEREIN.
<br />2.THE DRAWINGS ARE GENERALLY DIAGRAMMATIC. THEY DO NOT SHOW EVERY BEND, OFFSET, ELBOW OR
<br />OTHER FITTINGS WHICH MAY BE REQUIRED FOR THE INSTALLATION IN THE SPACE ALLOCATED, OR FOR
<br />COORDINATION WITH OTHER TRADES.
<br />3.DRAWINGS ARE NOT TO BE SCALED. UNLESS SPECIFIC DIMENSIONS ARE SHOWN, THE SITE CONDITIONS
<br />SHALL GOVERN THE EXACT LOCATION OF MECHANICAL EQUIPMENT AND APPURTENANCES.
<br />4.SUBMIT SHOP DRAWINGS OF ALL MATERIALS, DUCTWORK, PIPING, AND EQUIPMENT FOR REVIEW BY
<br />ENGINEER PRIOR TO ORDERING, FABRICATION, AND/OR INSTALLATION.
<br />5.THE NATURE OF THIS CONTRACT INVOLVES REMODELING OF EXISTING FACILITIES. THE CONTRACTOR SHALL
<br />VISIT AND CAREFULLY EXAMINE THOSE PORTIONS OF THE BUILDING AFFECTED BY THIS WORK BEFORE
<br />SUBMITTING PROPOSALS SO AS TO BECOME FAMILIAR WITH EXISTING CONDITIONS AND DIFFICULTIES THAT
<br />WILL AFFECT EXECUTION OF WORK.
<br />6.ALL SERVICES INTERRUPTION AND ALL REMOVAL & DISPOSAL WORK SHALL BE SCHEDULED AND
<br />COORDINATED WITH THE AUTHORIZED REPRESENTATIVE OF THE FACILITIES DEPARTMENT. MECHANICAL
<br />SYSTEMS SHALL REMAIN OPERATIONAL DURING BUILDING NORMAL OPERATING HOURS. COORDINATE WORK
<br />TO CAUSE MINIMUM DOWNTIME OF ANY BUILDING SERVICE.
<br />7.ALL EQUIPMENT AND DEVICES IN SERVICEABLE CONDITIONS REMOVED UNDER THIS CONTRACT SHALL BE
<br />PROTECTED AND STORED AT THE JOB SITE FOR DELIVERY BY THE CONTRACTOR TO A LOCATION DESIGNATED
<br />BY THE OWNER/LANDLORD. ALL OTHERS, INCLUDING DUCTWORK, PIPING AND ACCESSORIES, SHALL BE
<br />PHYSICALLY REMOVED AND DISPOSED OF BY CONTRACTOR, UNLESS OTHERWISE INDICATED. CONTRACTOR
<br />SHALL COORDINATE WITH OWNER FOR FINAL ARRANGEMENTS.
<br />8.CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF EQUIPMENT AND ITEMS TO BE REMOVED TO THE OWNER.
<br />ALL ITEMS THAT THE OWNER WISHES TO RETAIN SHALL BE TURNED OVER TO OWNER AND THE REMAINDER
<br />SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN A PROPER MANNER BY CONTRACTOR.
<br />9.ANY EQUIPMENT OR DEVICE TO REMAIN THAT MIGHT HAVE TO BE DISCONNECTED BECAUSE OF THE
<br />REMOVAL OF ANY OTHER DEVICE MUST BE RECONNECTED AND TIED BACK TO THE EXISTING BUILDING
<br />SYSTEMS AND TESTED FOR CORRECT OPERATION.
<br />10.ALL BUILDING CONSTRUCTION AFFECTED BY THE REMOVAL, RELOCATION, INSTALLATION OF ANY PIECE OF
<br />EQUIPMENT SHALL BE REPAIRED AND REFINISHED AS REQUIRED TO MATCH EXISTING CONDITIONS OR AS
<br />DIRECTED BY THE OWNER.
<br />11.PROTECT SURROUNDING UTILITIES, WALLS, FLOORS AND CEILINGS FROM DAMAGE DURING CONSTRUCTION.
<br />THE CONTRACTOR SHALL BEAR ALL EXPENSE FOR REPAIR OR REPLACEMENT OF UTILITIES OR OTHER
<br />PROPERTY DAMAGED DURING CONSTRUCTION.
<br />12.WORK CONSIDERED NECESSARY FOR THE COMPLETION OF THE WORK IN PROPER MANNER NOT SHOWN ON
<br />THE PLANS OR NOTES SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER/ENGINEER IN WRITING FOR
<br />APPROVAL.
<br />13.CONTRACTOR SHALL SUBMIT A COMPLETE "AS-BUILT" RECORD SET TO OWNER.
<br />14.CUT ALL OPENINGS, CHASES, TRENCHES, ETC. REQUIRED TO ACCOMMODATE THE WORK UNDER THIS
<br />DIVISION AND REPAIR ALL WALLS, ROOF, ETC. DAMAGED BY SUCH CUTTINGS. ALL WORK DONE UNDER THIS
<br />HEADING MUST CONFORM IN EVERY RESPECT TO FINISH AND QUALITY OF MATERIALS AND WORKMANSHIP
<br />SPECIFIED UNDER APPROPRIATE SECTIONS FOR THIS BUILDING.
<br />15.CONTRACTOR SHALL VERIFY SPACE CONDITIONS AND DIMENSIONS AT JOB SITE AND SHALL COORDINATE
<br />WORK WITH ALL OTHER TRADES SUCH AS ELECTRICAL, STRUCTURAL, PLUMBING, FIRE SPRINKLERS, LIGHT
<br />FIXTURES, CEILING CONSTRUCTION AND SUPPORTS PRIOR TO ORDERING, FABRICATION, AND INSTALLATION
<br />OF EQUIPMENT, DUCTWORK AND PIPING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FULL
<br />COORDINATION OF THIS WORK WITH THAT OF ALL OTHER TRADES. ANY CONFLICTS SHALL BE REPORTED
<br />IMMEDIATELY TO THE ARCHITECT/ENGINEER PRIOR TO BEGINNING OF CONSTRUCTION.
<br />16.OBTAIN FULL INFORMATION REGARDING PECULIARITIES AND LIMITATIONS OF SPACE AVAILABLE FOR
<br />INSTALLATION OF THE EQUIPMENT AND MATERIALS UNDER THIS CONTRACT, AND PROVIDE READY
<br />ACCESSIBILITY TO DAMPERS, AND OTHER APPARATUS, INCLUDING ANY PART OF SYSTEM REQUIRED TO BE
<br />REACHED FOR MAINTENANCE AND OPERATIONS.
<br />17.ALL DUCT SIZES SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS.
<br />18.ALL EQUIPMENT AND MATERIALS SHALL BE GUARANTEED FOR THE PERIOD OF ONE YEAR.
<br />19.ALL MECHANICAL EQUIPMENT SHALL BE ARI AND U.L. LISTED WHERE APPLICABLE AND RATED FOR THE
<br />REQUIRED SERVICE, PRESSURES, TEMPERATURES, AND SHALL BE PROVIDED WITH ALL NECESSARY
<br />TRANSFORMERS, SEALS VALVES, CONTROLS, CONNECTIONS, GAUGES, ETC. TO FUNCTION PROPERLY.
<br />20.ALL CONTROL WIRING SHALL BE THE RESPONSIBILITY OF THE CONTROLS CONTRACTOR. ALL CONTROL
<br />WIRING SHALL RUN IN CONDUITS.
<br />21.ALL WORK SHALL BE COORDINATED WITH THE WORK OF OTHER TRADES TO AVOID INTERFERENCE WITH
<br />PROGRESS OF CONSTRUCTION AND IN STRICT COMPLIANCE WITH ALL APPLICABLE CURRENT CODES AND
<br />STANDARDS, INCLUDING NFPA.
<br />22.REFER TO ALL CONSTRUCTION DOCUMENTS, INCLUDING SPECIFICATIONS BOOK, FOR COORDINATION OF
<br />THE HVAC WORK AND TO DETERMINE SCOPE OF WORK.
<br />23.PROTECT AND FIRE SEAL ALL OPENINGS AND PIPE/CONDUITS PENETRATIONS THROUGH FIRE RATED WALLS
<br />AND CEILING WITH ADEQUATE FIRESTOPPING (UL LISTED) MATERIALS TO MAINTAIN THE INDICATED FIRE
<br />RATINGS OF THE ASSEMBLIES BEING PENETRATED.
<br />24.PROVIDE CEILING/WALL ACCESS PANELS WHERE INDICATED IN THE DRAWINGS AND WHERE REQUIRED TO
<br />ACCESS HVAC EQUIPMENT/DEVICES AS PER MECH-FBC SECTION 607.4. PANELS SHALL BE RECESSED TYPE,
<br />FIRE RATED IF IN FIRE RATED WALLS OR CEILINGS. LOCATIONS OF PANELS SHALL BE COORDINATED WITH ALL
<br />THE OTHER TRADES.
<br />25.VERIFY ALL VOLATGES WITH ELECTRICAL CONTRACTOR PRIOR ORDERING ANY EQUIPMENT.
<br />26.ALL FAN DRIVES SHALL BE ADJUSTED TO DELIVER THE SPECIFIED CFM AGAINST THE ACTUAL STATIC
<br />PRESSURE OF THE INSTALLATION.
<br />27.ALL DUCTWORK SHALL BE LEAK TESTED AS PER LATEST FLORIDA BUILDING CODE. SEAL ALL DUCTS, JOINTS
<br />AN SEAMS IN AN APPROVED MANNER AND INSURE AGAINST LEAKAGE.
<br />28.ALL OUTSIDE AIR INTAKES SHALL BE AT 10'-0" MINIMUM DISTANCE FROM ANY EXHAUST DISCHARGE OR
<br />PLUMBING VENTS.
<br />29.ALL SMOKE DUCT DETECTORS SHALL BE PROVIDED WITH AN ACCESS DOOR ON DUCTWORK (ULTRA LOW
<br />LEAKAGE INSULATED & GASKETED) OF ADEQUATE SIZE FOR INSPECTION AND SERVICEABILITY AS PER NFPA
<br />90A, SEC. A-2-3.4.1 AND MECH-FBC SECTION 607.4. FIELD COORDINATE LOCATION / SIDE OF ACCESS
<br />DOOR ACCORDINGLY.
<br />30.COORDINATION DRAWINGS: THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND SHALL BE FOLLOWED AS
<br />CLOSELY AS POSSIBLE. PRIOR TO COMMENCEMENT OF ORDERING MATERIAL, FABRICATION OR
<br />INSTALLATION, THE CONTRACTOR SHALL DEVELOP AS REQUIRED DETAILED COORDINATION DRAWINGS
<br />SHOWING CLEARANCES WITH BUILDING STRUCTURE, CEILINGS HEIGHT AND OVERALL COORDINATION WITH
<br />ALL OTHER TRADES. WHENEVER THERE IS A CONFLICT, THE CONTRACTOR SHALL SHOW THE PROPOSED
<br />SOLUTION ON THE COORDINATION DRAWINGS. DUCTWORK, PIPING OFFSETS, RISES/DROPS, RE-ROUTING
<br />AND RE-DIMENSIONING SHALL BE SHOWN ON THE COORDINATION DRAWINGS FOR REVIEW AND APPROVAL
<br />BY THE ENGINEER.
<br />31.ALL EQUIPMENT, PIPING & DUCTWORK SUPPORT COMPONENTS SHALL BE HOT-DIPPED GALVANIZED.
<br />32.ALL ACTUATORS FOR CONTROL VALVES AND DAMPERS SHALL HAVE THE CAPABILITY FOR FULL FEEDBACK.
<br />33.PROVIDE NEW FILTERS FOR ALL HVAC EQUIPMENT BEFORE START-UP & TESTING. REPLACE FILTERS PRIOR TO
<br />FINAL ACCEPTANCE BY OWNER.
<br />34.ALL DUCTWORK (SUPPLY, RETURN, OUTSIDE AIR AND EXHAUST, EXCEPT GREASE EXHAUST SYSTEM DUCTS -
<br />REFER TO SHEET M10-01 FOR REQUIREMENTS) SHALL BE GALVANIZED SHEET METAL WITH SEALED SEAMS
<br />AND JOINTS. ALL SUPPLY, RETURN AND OUTSIDE AIR DUCT SHALL BE EXTERNALLY INSULATED WITH R-6
<br />MINIMUM. ALL METAL EXHAUST, MAKE-UP/OUTSIDE INSTALLED IN LOCATIONS WHERE DEWPOINT CONDITIONS
<br />CAN OCCUR INSIDE THE DUCT SHALL BE INSULATED WITH R-8 MINIMUM. REFER TO SPECIFICATIONS BOOK
<br />FOR ALL REQUIREMENTS.
<br />35.ALL MECHANICAL EQUIPMENT AND DUCTWORK INSTALLATION ON THE EXTERIOR OF THE BUILDING SHALL BE
<br />CAPABLE TO WITHSTAND HIGH VELOCITY WINDS AS REQUIRED BY FBC.
<br />36.PROVIDE FIRE WATCH DURING ANY ANTICIPATED HOT WORK AND/OR SYSTEM SHUT-DOWNS AS REQUIRED
<br />PER NFPA 101 & NFPA 25 CHAPTER 15. PROVIDE ADDITIONAL FIRE EXTINGUISHER(S) AS REQUIRED DURING
<br />DEMOLITION/CONSTRUCTION.
<br />37.FLEXIBLE DUCTWORK: FLEXIBLE DUCTS SHALL BE COMPLY WITH FBC SECTIONS 419.3.6.4 THROUGH
<br />419.3.6.4.4 AND LISTED BY UNDERWRITERS LABORATORIES, INC., UNDER UL STANDARD 181 AS A CLASS 1
<br />FLEXIBLE AIR DUCT AND COMPLYING WITH NFPA STANDARDS 90A AND 90B.
<br />A.DUCTS SHALL BE FACTORY MADE AND COMPOSED OF A CONTINUOUS METAL LINER DUCT (CPE LINER)
<br />PERMANENTLY BONDED TO A COATED SPRING STEEL WIRE HELIX, INSULATED WITH 2" THICK 3/4 LB.
<br />DENSITY FIBERGLASS INSULATING BLANKET (R-VALUE NOT LESS THAN 6.0), AND COVERED WITH LOW
<br />PERMEABILITY OUTER VAPOR BARRIER OF FIBERGLASS REINFORCED FILM LAMINATE. APPROVED
<br />MANUFACTURER & MODEL: THERMAFLEX M-KE, FLEXMASTER 1M, OR APPROVED EQUAL.
<br />38.DUE TO DRAWINGS BEING DIAGRAMMATIC IN NATURE RISERS AND DROPS ARE NOT SHOWN -CONTRACTOR
<br />SHALL INCLUDE THESE IN THE BID -WHERE POSSIBLE ALL RISERS AND DROPS SHALL BE CONSTRUCTED
<br />USING 45 DEGREE OR LONG RADIUS ELBOWS.
<br />39.PROVIDE AND INSTALL NECESSARY DUCTWORK TRANSITIONS AND PIPING INCREASERS / REDUCERS AS
<br />REQUIRED FOR EQUIPMENT CONNECTIONS. CONSULT MANUFACTURER'S DATA FOR ACTUAL DUCTWORK AND
<br />PIPING CONNECTIONS SIZES, INCLUDING, BUT NOT LIMITED TO THOSE SHOWN.
<br />40.PROVIDE MANUAL VOLUME DAMPERS AT ALL BRANCH DUCTS TO INDIVIDUAL DIFFUSERS AND GRILLES.
<br />PROVIDE DAMPERS AS CLOSE AS POSSIBLE TO MAIN IN BRANCH CONNECTION. REFER TO DETAILS.
<br />41.NO DUCTWORK OR PIPING SHALL BE INSTALLED UNTIL IT IS COORDINATED WITH ALL OTHER TRADES
<br />AFFECTED. PROVIDE ALL OFFSETS REQUIRED TO AVOID INTERFERENCE WITH OTHER TRADES, EXISTING
<br />CONDITIONS AND WITH THE STRUCTURE, INCLUDING, BUT NOT LIMITED TO, THOSE SHOWN.
<br />42.IF NO SIZE IS SHOWN FOR DUCT SERVING DIFFUSER OR GRILLES, USE NECK SIZE SHOWN ON DIFFUSER AND
<br />GRILLE SCHEDULE.
<br />43.DO NOT BLOCK TUBE PULL OR SERVICE SPACE ON EQUIPMENT WITH PIPING, DUCTWORK, ETC.
<br />44.ALL CONDUITS, PIPING, DUCTWORK ROUTED PARALLEL TO RATED WALLS (FIRE, FIRE/SMOKE, SMOKE OR
<br />CORRIDORS) SHALL BE INSTALLED WITH MINIMUM 6" CLEARANCE TO ALLOW FOR INSPECTION OF WALL
<br />PENETRATIONS AS PER FBC. CONTRACTOR SHALL PROVIDE 12" CLEARANCE WHERE POSSIBLE.
<br />45.PROVIDE MINIMUM CLEARANCE OF 36" IN FRONT OF ALL 120/208V PANELS AND MINIMUM 42" IN FRONT OF
<br />277/480V PANELS. PROVIDE ADEQUATE CLEARANCES PER N.E.C.
<br />46.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL WORK NECESSARY TO PREPARE THE
<br />STRUCTURE FOR THE INSTALLATION OF THE MECHANICAL SYSTEMS. AS PART OF DEMOLITION, ALL HOLES,
<br />OPENINGS AND ANY DAMAGED MATERIALS OR SURFACES SHALL BE REPAIRED AND FINISHED TO MATCH
<br />EXISTING.
<br />47.ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE REQUIREMENTS OF THE OWNER.
<br />48.EXACT LOCATION OF CEILING DIFFUSER, GRILLES, REGISTERS, ETC. TO BE COORDINATED WITH
<br />ARCHITECTURAL REFLECTED CEILING PLANS.
<br />49.PROVIDE MANUFACTURER'S CERTIFIED DATA (NOA) OR CALCULATIONS ON ALL EXTERIOR MOUNTED
<br />EQUIPMENT DURING SUBMITTAL PHASE, WHICH INDICATES THAT THE EQUIPMENT CAN WITHSTAND A WIND
<br />LOAD REQUIRED BY THE FBC.
<br />50.HVAC CONTRACTOR SHALL PROVIDE ALL SHEET METAL AND PIPING TRANSITIONS TO DIFFUSERS, TERMINAL
<br />BOXES, COILS AND OTHER SIMILAR HVAC EQUIPMENT.
<br />51.ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S APPROVED PUBLISHED
<br />LITERATURE.
<br />52.PROVIDE INSTRUMENTAL TEST HOLES IN DUCTWORK WHEREVER VOLUME DAMPERS ARE REQUIRED.
<br />53.EXACT LOCATIONS OF THERMOSTATS TO BE COORDINATED WITH ALL OTHER TRADES ARCHITECT BEFORE
<br />ROUGH-IN OR INSTALLATION.
<br />54.ALL EXPOSED EQUIPMENT (REGISTERS, GRILLES, DIFFUSERS, ETC.) SHALL HAVE COLORS SELECTED BY THE
<br />ARCHITECT UNLESS OTHERWISE NOTED.
<br />55.ALL STRAINER/RELIEF VALVE DISCHARGE PIPING SHALL RUN TO 12" ABOVE FINISHED FLOOR OR NEAREST
<br />FLOOR DRAIN.
<br />56.COORDINATE ALL STRUCTURAL SUPPORTS AND HOUSEKEEPING CONCRETE PAD REQUIREMENTS WITH
<br />ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR ALL EQUIPMENT REQUIRING SAME.
<br />57.COORDINATE ALL MOTOR, STARTER, VFD OR DISCONNECT REQUIREMENTS WITH ELECTRICAL DRAWINGS FOR
<br />ALL EQUIPMENT REQUIRING SAME.
<br />58.REFER TO SPECIFICATIONS BOOK FOR ALL OTHER REQUIREMENTS.
<br />1423
<br />A
<br />C
<br />B
<br />1423
<br />A
<br />C
<br />SHEET NUMBER
<br />TITLE
<br />Approved
<br />Checked
<br />Drawn
<br />Job Number
<br />ISSUE CHART
<br />CONSULTANTS
<br />KEYPLAN
<br />PROJECT
<br />B
<br />PE
<br />R
<br />M
<br />I
<br />T
<br />
<br />S
<br />E
<br />T
<br />
<br />1
<br />2
<br />.
<br />0
<br />6
<br />.
<br />1
<br />8
<br />FIRM CERTIFICATION C.A #6057
<br />JOHN MOUDLER P.E: #33200
<br />CARLOS E. JIMENEZ P.E: #47923
<br />JOHN J. PETERS RCDD: #193108R
<br />BR+A CONSULTING ENGINEERS
<br />2600 DOUGLAS ROAD, SUITE 1100
<br />CORAL GABLES, FL 33134
<br />THORNTON TOMASETTI
<br />101 NE THIRD AVENUE, SUITE 1170
<br />FORT LAUDERDALE, FL 3330`
<br />f.954.903.9300
<br />f 954.903 9301
<br />ESI CONSULTING ENGINEERS, INC
<br />1315 NW 98TH CT, UNIT 15
<br />DORAL, FL 33172
<br />t. 305.418.9177 f 305.418.9178
<br />HVAC
<br />STRUCTURAL ENGINEERS
<br />ELECTRICAL + PLUMBING
<br />INMAN FOODSERICE GROUP
<br />1330 CORAL WAY
<br />SUITE 310
<br />MIAMI, FL 33145
<br />FOOD SERVICE
<br />FIRM CERTIFICATION C.A. #26243
<br />IGOR F. GONZALEZ P.E. #56098
<br />1 2 /4 /2 0 1 8 6 :1 3 :3 1 P M
<br />D :\U s e r s \K a r i n \D o c u m e n t s \C 0 2 0 3 2 1 1 8 -M E C H _R 1 8 _k a r i n c @ e s i c o n s u l t .c o m .r v t
<br />M00-00
<br />MECHANICAL GENERAL
<br />NOTES, SYMBOLS
<br />LEGEND &
<br />ABBREVIATIONS
<br />Checker
<br />Author
<br />810495.000
<br />Approver
<br />SIB -GATEWAY
<br />PARK
<br />PROJECT ADDRESS:
<br />151 Sunny Isles Blvd
<br />Sunny Isles Beach, FL
<br />33160
<br />2800 Ponce De Leon Blvd,
<br />Suite 1300,
<br />Coral Gables, FL 3313
<br />t 305.569.1333
<br />f 305.569.1334
<br />www.perkinswill.com
<br />MARK ISSUE DATE
<br />PERMIT SET 12.06.2018
|