Laserfiche WebLink
T <br />MECHANICAL ABBREVIATIONS <br />SYMBOL DESCRIPTION <br />AD ACCESS DOOR <br />AC AIR CONDITIONING UNIT <br />AHU AIR HANDLING UNIT <br />ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION AND <br />AIR-CONDITIONING ENGINEERS <br />BHP BRAKE HORSEPOWER <br />CLNG CEILING <br />CD CEILING DIFFUSER <br />CFM CUBIC FEET PER MINUTE <br />COND CONDENSER/CONDENSATE <br />CR CEILING REGISTER <br />CU CONDENSING UNIT <br />DDT DUAL DUCT TERMINAL <br />DN DOWN <br />E/A EXHAUST AIR <br />EE EXISTING EXHAUST GRILLE <br />ER EXISTING RETURN GRILLE/REGISTER <br />ES EXISTING SUPPLY DIFFUSER <br />EQPM EQUIPMENT <br />EXH EXHAUST <br />EXIST EXISTING <br />FC FLEXIBLE CONNECTION <br />FCU FAN COIL UNIT <br />FD FIRE DAMPER <br />FPB FAN POWERED BOX <br />HP HORSEPOWER <br />INSUL INSULATION <br />LAT LEAVING AIR TEMPERATURE (AT UNIT'S COIL) <br />O/A OUTSIDE AIR <br />RS RELOCATED SUPPLY <br />R/A RETURN AIR <br />RTU ROOFTOP UNIT <br />S/A SUPPLY AIR <br />S/E SMOKE EVAC <br />SD SMOKE DETECTOR <br />TB TRANSFER BOOT <br />TD TRANSFER DUCT <br />TG TRANSFER GRILLE <br />TS TRANSFER <br />U.O.N.UNLESS OTHERWISE NOTED <br />MECHANICAL LEGEND & SYMBOLS <br />SYMBOL DESCRIPTION <br />THERMOSTAT <br />POINT OF CONNECTION TO EXISTING <br />DUCTWORK OR PIPING <br />DOOR UNDERCUT <br />NEW HVAC ITEM/DUCTWORK <br />EXISTING HVAC ITEM <br />EXISTING HVAC ITEM TO BE REMOVED <br />EXISTING HVAC ITEM TO BE RELOCATED <br />DUCT WITH CAPPED END <br />CONCENTRIC REDUCER <br />ECCENTRIC REDUCER <br />TRANSITION: RECTANGULAR TO ROUND <br />SINGLE DUCT VAV TERMINAL UNIT <br />SINGLE DUCT VAV TERMINAL UNIT WITH <br />HEATER <br />FIRE DAMPER <br />MANUAL VOLUME DAMPER <br />FIRESTOP PENETRATION <br />EXISTING OR HIDDEN SUPPLY DIFFUSER <br />NEW SUPPLY DIFFUSER ARROWS <br />INDICATE AIR FLOW PATTERN <br />EXISTING OR HIDDEN EXHAUST/RETURN GRILLE <br />NEW EXHAUST/RETURN GRILLE <br />SUPPLY DUCT/OUTSIDE AIR DUCT IN SECTION <br />RETURN DUCT/EXHAUST DUCT IN SECTION <br />FLEXIBLE ROUND DUCT <br />AIRFLOW MEASURING DAMPER <br />(TAMCO/EBTRON COMBINATION 1500SW) <br />EXISTING SUPPLY / EXISTING RETURN <br />AIR TERMINAL DESIGNATOR AIR <br />TERMINAL (LETTER DESIGNATOR) <br />AIR FLOW <br />(CFM) <br />QUANTITY IN ROOM (IF MORE THAN 1) <br />OUTSIDE AIR CALCULATIONS SCHEDULE <br />PER FLORIDA BUILDING CODE MECHANICAL 6TH EDITION (2017) MINIMUM VENTILATION RATES TABLE 403.3.1.1 <br />OCCUPANCY VENTILATION <br />UNIT TYPE OF OCCUPANCY <br />FLOOR AREA <br />(FT²) * <br />PERSONS PER <br />1000 FT² <br />TOTAL <br />PERSONS <br /># OF PLUM <br />FIXTURES CFM/PERSON CFM/FT ² <br />EXHAUST <br />AIRFLOW RATE <br />(CFM / FIXTURE) <br />CFM <br />REQUIRED <br />CFM <br />PROVIDED <br />RTU-1 <br />RECEPTION AREA 820 30 2 -5 0.06 -60 <br />CORRIDOR 305 ----0.06 -18 <br />O/A SUB-TOTAL 78 190 <br />RTU-2 <br />MAIN ENTRY LOBBY 2235 10 33 -5 0.06 -299 <br />O/A SUB-TOTAL 299 690 <br />TOILET ROOM 80 --1 --50 - 50 <br /> E/A SUB-TOTAL -75 <br />RTU-3 <br />OFFICE SPACES 575 5 7 -5 0.06 -70 <br />CONFERENCE RMS 300 50 12 -5 0.06 -78 <br />BREAKROOM 220 -3 -7.5 0.18 -62 <br />CORRIDORS 565 ----0.06 -34 <br />STORAGE ROOMS 140 --0.12 -17 <br />O/A SUB-TOTAL 261 550 <br />TOILET ROOMS 590 --11 --50 - 550 <br /> E/A SUB-TOTAL - 550 <br />RTU-4 <br />FITNESS ROOM 1320 40 27 -20 0.06 -620 <br />O/A SUB-TOTAL 620 750 <br />RTU-5 <br />LECTURE CLASSROOM 915 65 25 -7.5 0.06 -243 <br />O/A SUB-TOTAL 243 300 <br />RTU-6 <br />CATERING KITCHEN 1020 --0.7 CFM/FT 2 ----714 <br /> E/A SUB-TOTAL -714 - 4480 <br />RTU-7 <br />LECTURE CLASSROOM 630 65 18 -7.5 0.06 -173 <br />O/A SUB-TOTAL 173 240 <br />AHU-8 <br />MULTIPURPOSE ROOM 3800 120 240 -5 0.06 -1428 <br />CORRIDORS 145 ----0.06 -9 <br />STORAGE ROOMS 190 --0.12 -23 <br />O/A SUB-TOTAL 1460 1875 <br />* NET AREA <br />NOTE : <br />NOT ALL SYMBOLS AND ABBREVIATIONS LISTED APPLY TO THIS PROJECT. REFER TO <br />CONSTRUCTION DOCUMENTS FOR SCOPE OF WORK. <br />FD <br />3 A 300 <br />FS <br />ES ER <br />AFMD <br />CODE COMPLIANCE <br />MECHANICAL WORK SHALL COMPLY WITH THE FOLLOWING STANDARDS & CODES AS APPLICABLE: <br />2017 FLORIDA BUILDING CODE (6TH EDITION) <br />2017 FBC MECHANICAL CODE (6TH EDITION) <br />2017 FLORIDA FIRE PREVENTION CODE, 6TH EDITION (NFPA 1-2015 & NFPA 101-2015) <br />2015 NFPA 90A -STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS <br />2015 NFPA 101 -LIFE SAFETY CODE <br />LATEST ASHRAE STANDARDS <br />GENERAL NOTES <br />1.THE WORK THAT IS TO BE DONE UNDER THIS HEADING INCLUDES THE FURNISHING OF ALL LABOR, <br />MATERIALS AND EQUIPMENT, PERMITS, FEES, INSPECTIONS, TEST, INSURANCE, ETC., REQUIRED FOR THE <br />COMPLETION OF THE WORK SHOWN ON DRAWINGS OR LISTED HEREIN. <br />2.THE DRAWINGS ARE GENERALLY DIAGRAMMATIC. THEY DO NOT SHOW EVERY BEND, OFFSET, ELBOW OR <br />OTHER FITTINGS WHICH MAY BE REQUIRED FOR THE INSTALLATION IN THE SPACE ALLOCATED, OR FOR <br />COORDINATION WITH OTHER TRADES. <br />3.DRAWINGS ARE NOT TO BE SCALED. UNLESS SPECIFIC DIMENSIONS ARE SHOWN, THE SITE CONDITIONS <br />SHALL GOVERN THE EXACT LOCATION OF MECHANICAL EQUIPMENT AND APPURTENANCES. <br />4.SUBMIT SHOP DRAWINGS OF ALL MATERIALS, DUCTWORK, PIPING, AND EQUIPMENT FOR REVIEW BY <br />ENGINEER PRIOR TO ORDERING, FABRICATION, AND/OR INSTALLATION. <br />5.THE NATURE OF THIS CONTRACT INVOLVES REMODELING OF EXISTING FACILITIES. THE CONTRACTOR SHALL <br />VISIT AND CAREFULLY EXAMINE THOSE PORTIONS OF THE BUILDING AFFECTED BY THIS WORK BEFORE <br />SUBMITTING PROPOSALS SO AS TO BECOME FAMILIAR WITH EXISTING CONDITIONS AND DIFFICULTIES THAT <br />WILL AFFECT EXECUTION OF WORK. <br />6.ALL SERVICES INTERRUPTION AND ALL REMOVAL & DISPOSAL WORK SHALL BE SCHEDULED AND <br />COORDINATED WITH THE AUTHORIZED REPRESENTATIVE OF THE FACILITIES DEPARTMENT. MECHANICAL <br />SYSTEMS SHALL REMAIN OPERATIONAL DURING BUILDING NORMAL OPERATING HOURS. COORDINATE WORK <br />TO CAUSE MINIMUM DOWNTIME OF ANY BUILDING SERVICE. <br />7.ALL EQUIPMENT AND DEVICES IN SERVICEABLE CONDITIONS REMOVED UNDER THIS CONTRACT SHALL BE <br />PROTECTED AND STORED AT THE JOB SITE FOR DELIVERY BY THE CONTRACTOR TO A LOCATION DESIGNATED <br />BY THE OWNER/LANDLORD. ALL OTHERS, INCLUDING DUCTWORK, PIPING AND ACCESSORIES, SHALL BE <br />PHYSICALLY REMOVED AND DISPOSED OF BY CONTRACTOR, UNLESS OTHERWISE INDICATED. CONTRACTOR <br />SHALL COORDINATE WITH OWNER FOR FINAL ARRANGEMENTS. <br />8.CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF EQUIPMENT AND ITEMS TO BE REMOVED TO THE OWNER. <br />ALL ITEMS THAT THE OWNER WISHES TO RETAIN SHALL BE TURNED OVER TO OWNER AND THE REMAINDER <br />SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN A PROPER MANNER BY CONTRACTOR. <br />9.ANY EQUIPMENT OR DEVICE TO REMAIN THAT MIGHT HAVE TO BE DISCONNECTED BECAUSE OF THE <br />REMOVAL OF ANY OTHER DEVICE MUST BE RECONNECTED AND TIED BACK TO THE EXISTING BUILDING <br />SYSTEMS AND TESTED FOR CORRECT OPERATION. <br />10.ALL BUILDING CONSTRUCTION AFFECTED BY THE REMOVAL, RELOCATION, INSTALLATION OF ANY PIECE OF <br />EQUIPMENT SHALL BE REPAIRED AND REFINISHED AS REQUIRED TO MATCH EXISTING CONDITIONS OR AS <br />DIRECTED BY THE OWNER. <br />11.PROTECT SURROUNDING UTILITIES, WALLS, FLOORS AND CEILINGS FROM DAMAGE DURING CONSTRUCTION. <br />THE CONTRACTOR SHALL BEAR ALL EXPENSE FOR REPAIR OR REPLACEMENT OF UTILITIES OR OTHER <br />PROPERTY DAMAGED DURING CONSTRUCTION. <br />12.WORK CONSIDERED NECESSARY FOR THE COMPLETION OF THE WORK IN PROPER MANNER NOT SHOWN ON <br />THE PLANS OR NOTES SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER/ENGINEER IN WRITING FOR <br />APPROVAL. <br />13.CONTRACTOR SHALL SUBMIT A COMPLETE "AS-BUILT" RECORD SET TO OWNER. <br />14.CUT ALL OPENINGS, CHASES, TRENCHES, ETC. REQUIRED TO ACCOMMODATE THE WORK UNDER THIS <br />DIVISION AND REPAIR ALL WALLS, ROOF, ETC. DAMAGED BY SUCH CUTTINGS. ALL WORK DONE UNDER THIS <br />HEADING MUST CONFORM IN EVERY RESPECT TO FINISH AND QUALITY OF MATERIALS AND WORKMANSHIP <br />SPECIFIED UNDER APPROPRIATE SECTIONS FOR THIS BUILDING. <br />15.CONTRACTOR SHALL VERIFY SPACE CONDITIONS AND DIMENSIONS AT JOB SITE AND SHALL COORDINATE <br />WORK WITH ALL OTHER TRADES SUCH AS ELECTRICAL, STRUCTURAL, PLUMBING, FIRE SPRINKLERS, LIGHT <br />FIXTURES, CEILING CONSTRUCTION AND SUPPORTS PRIOR TO ORDERING, FABRICATION, AND INSTALLATION <br />OF EQUIPMENT, DUCTWORK AND PIPING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FULL <br />COORDINATION OF THIS WORK WITH THAT OF ALL OTHER TRADES. ANY CONFLICTS SHALL BE REPORTED <br />IMMEDIATELY TO THE ARCHITECT/ENGINEER PRIOR TO BEGINNING OF CONSTRUCTION. <br />16.OBTAIN FULL INFORMATION REGARDING PECULIARITIES AND LIMITATIONS OF SPACE AVAILABLE FOR <br />INSTALLATION OF THE EQUIPMENT AND MATERIALS UNDER THIS CONTRACT, AND PROVIDE READY <br />ACCESSIBILITY TO DAMPERS, AND OTHER APPARATUS, INCLUDING ANY PART OF SYSTEM REQUIRED TO BE <br />REACHED FOR MAINTENANCE AND OPERATIONS. <br />17.ALL DUCT SIZES SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS. <br />18.ALL EQUIPMENT AND MATERIALS SHALL BE GUARANTEED FOR THE PERIOD OF ONE YEAR. <br />19.ALL MECHANICAL EQUIPMENT SHALL BE ARI AND U.L. LISTED WHERE APPLICABLE AND RATED FOR THE <br />REQUIRED SERVICE, PRESSURES, TEMPERATURES, AND SHALL BE PROVIDED WITH ALL NECESSARY <br />TRANSFORMERS, SEALS VALVES, CONTROLS, CONNECTIONS, GAUGES, ETC. TO FUNCTION PROPERLY. <br />20.ALL CONTROL WIRING SHALL BE THE RESPONSIBILITY OF THE CONTROLS CONTRACTOR. ALL CONTROL <br />WIRING SHALL RUN IN CONDUITS. <br />21.ALL WORK SHALL BE COORDINATED WITH THE WORK OF OTHER TRADES TO AVOID INTERFERENCE WITH <br />PROGRESS OF CONSTRUCTION AND IN STRICT COMPLIANCE WITH ALL APPLICABLE CURRENT CODES AND <br />STANDARDS, INCLUDING NFPA. <br />22.REFER TO ALL CONSTRUCTION DOCUMENTS, INCLUDING SPECIFICATIONS BOOK, FOR COORDINATION OF <br />THE HVAC WORK AND TO DETERMINE SCOPE OF WORK. <br />23.PROTECT AND FIRE SEAL ALL OPENINGS AND PIPE/CONDUITS PENETRATIONS THROUGH FIRE RATED WALLS <br />AND CEILING WITH ADEQUATE FIRESTOPPING (UL LISTED) MATERIALS TO MAINTAIN THE INDICATED FIRE <br />RATINGS OF THE ASSEMBLIES BEING PENETRATED. <br />24.PROVIDE CEILING/WALL ACCESS PANELS WHERE INDICATED IN THE DRAWINGS AND WHERE REQUIRED TO <br />ACCESS HVAC EQUIPMENT/DEVICES AS PER MECH-FBC SECTION 607.4. PANELS SHALL BE RECESSED TYPE, <br />FIRE RATED IF IN FIRE RATED WALLS OR CEILINGS. LOCATIONS OF PANELS SHALL BE COORDINATED WITH ALL <br />THE OTHER TRADES. <br />25.VERIFY ALL VOLATGES WITH ELECTRICAL CONTRACTOR PRIOR ORDERING ANY EQUIPMENT. <br />26.ALL FAN DRIVES SHALL BE ADJUSTED TO DELIVER THE SPECIFIED CFM AGAINST THE ACTUAL STATIC <br />PRESSURE OF THE INSTALLATION. <br />27.ALL DUCTWORK SHALL BE LEAK TESTED AS PER LATEST FLORIDA BUILDING CODE. SEAL ALL DUCTS, JOINTS <br />AN SEAMS IN AN APPROVED MANNER AND INSURE AGAINST LEAKAGE. <br />28.ALL OUTSIDE AIR INTAKES SHALL BE AT 10'-0" MINIMUM DISTANCE FROM ANY EXHAUST DISCHARGE OR <br />PLUMBING VENTS. <br />29.ALL SMOKE DUCT DETECTORS SHALL BE PROVIDED WITH AN ACCESS DOOR ON DUCTWORK (ULTRA LOW <br />LEAKAGE INSULATED & GASKETED) OF ADEQUATE SIZE FOR INSPECTION AND SERVICEABILITY AS PER NFPA <br />90A, SEC. A-2-3.4.1 AND MECH-FBC SECTION 607.4. FIELD COORDINATE LOCATION / SIDE OF ACCESS <br />DOOR ACCORDINGLY. <br />30.COORDINATION DRAWINGS: THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND SHALL BE FOLLOWED AS <br />CLOSELY AS POSSIBLE. PRIOR TO COMMENCEMENT OF ORDERING MATERIAL, FABRICATION OR <br />INSTALLATION, THE CONTRACTOR SHALL DEVELOP AS REQUIRED DETAILED COORDINATION DRAWINGS <br />SHOWING CLEARANCES WITH BUILDING STRUCTURE, CEILINGS HEIGHT AND OVERALL COORDINATION WITH <br />ALL OTHER TRADES. WHENEVER THERE IS A CONFLICT, THE CONTRACTOR SHALL SHOW THE PROPOSED <br />SOLUTION ON THE COORDINATION DRAWINGS. DUCTWORK, PIPING OFFSETS, RISES/DROPS, RE-ROUTING <br />AND RE-DIMENSIONING SHALL BE SHOWN ON THE COORDINATION DRAWINGS FOR REVIEW AND APPROVAL <br />BY THE ENGINEER. <br />31.ALL EQUIPMENT, PIPING & DUCTWORK SUPPORT COMPONENTS SHALL BE HOT-DIPPED GALVANIZED. <br />32.ALL ACTUATORS FOR CONTROL VALVES AND DAMPERS SHALL HAVE THE CAPABILITY FOR FULL FEEDBACK. <br />33.PROVIDE NEW FILTERS FOR ALL HVAC EQUIPMENT BEFORE START-UP & TESTING. REPLACE FILTERS PRIOR TO <br />FINAL ACCEPTANCE BY OWNER. <br />34.ALL DUCTWORK (SUPPLY, RETURN, OUTSIDE AIR AND EXHAUST, EXCEPT GREASE EXHAUST SYSTEM DUCTS - <br />REFER TO SHEET M10-01 FOR REQUIREMENTS) SHALL BE GALVANIZED SHEET METAL WITH SEALED SEAMS <br />AND JOINTS. ALL SUPPLY, RETURN AND OUTSIDE AIR DUCT SHALL BE EXTERNALLY INSULATED WITH R-6 <br />MINIMUM. ALL METAL EXHAUST, MAKE-UP/OUTSIDE INSTALLED IN LOCATIONS WHERE DEWPOINT CONDITIONS <br />CAN OCCUR INSIDE THE DUCT SHALL BE INSULATED WITH R-8 MINIMUM. REFER TO SPECIFICATIONS BOOK <br />FOR ALL REQUIREMENTS. <br />35.ALL MECHANICAL EQUIPMENT AND DUCTWORK INSTALLATION ON THE EXTERIOR OF THE BUILDING SHALL BE <br />CAPABLE TO WITHSTAND HIGH VELOCITY WINDS AS REQUIRED BY FBC. <br />36.PROVIDE FIRE WATCH DURING ANY ANTICIPATED HOT WORK AND/OR SYSTEM SHUT-DOWNS AS REQUIRED <br />PER NFPA 101 & NFPA 25 CHAPTER 15. PROVIDE ADDITIONAL FIRE EXTINGUISHER(S) AS REQUIRED DURING <br />DEMOLITION/CONSTRUCTION. <br />37.FLEXIBLE DUCTWORK: FLEXIBLE DUCTS SHALL BE COMPLY WITH FBC SECTIONS 419.3.6.4 THROUGH <br />419.3.6.4.4 AND LISTED BY UNDERWRITERS LABORATORIES, INC., UNDER UL STANDARD 181 AS A CLASS 1 <br />FLEXIBLE AIR DUCT AND COMPLYING WITH NFPA STANDARDS 90A AND 90B. <br />A.DUCTS SHALL BE FACTORY MADE AND COMPOSED OF A CONTINUOUS METAL LINER DUCT (CPE LINER) <br />PERMANENTLY BONDED TO A COATED SPRING STEEL WIRE HELIX, INSULATED WITH 2" THICK 3/4 LB. <br />DENSITY FIBERGLASS INSULATING BLANKET (R-VALUE NOT LESS THAN 6.0), AND COVERED WITH LOW <br />PERMEABILITY OUTER VAPOR BARRIER OF FIBERGLASS REINFORCED FILM LAMINATE. APPROVED <br />MANUFACTURER & MODEL: THERMAFLEX M-KE, FLEXMASTER 1M, OR APPROVED EQUAL. <br />38.DUE TO DRAWINGS BEING DIAGRAMMATIC IN NATURE RISERS AND DROPS ARE NOT SHOWN -CONTRACTOR <br />SHALL INCLUDE THESE IN THE BID -WHERE POSSIBLE ALL RISERS AND DROPS SHALL BE CONSTRUCTED <br />USING 45 DEGREE OR LONG RADIUS ELBOWS. <br />39.PROVIDE AND INSTALL NECESSARY DUCTWORK TRANSITIONS AND PIPING INCREASERS / REDUCERS AS <br />REQUIRED FOR EQUIPMENT CONNECTIONS. CONSULT MANUFACTURER'S DATA FOR ACTUAL DUCTWORK AND <br />PIPING CONNECTIONS SIZES, INCLUDING, BUT NOT LIMITED TO THOSE SHOWN. <br />40.PROVIDE MANUAL VOLUME DAMPERS AT ALL BRANCH DUCTS TO INDIVIDUAL DIFFUSERS AND GRILLES. <br />PROVIDE DAMPERS AS CLOSE AS POSSIBLE TO MAIN IN BRANCH CONNECTION. REFER TO DETAILS. <br />41.NO DUCTWORK OR PIPING SHALL BE INSTALLED UNTIL IT IS COORDINATED WITH ALL OTHER TRADES <br />AFFECTED. PROVIDE ALL OFFSETS REQUIRED TO AVOID INTERFERENCE WITH OTHER TRADES, EXISTING <br />CONDITIONS AND WITH THE STRUCTURE, INCLUDING, BUT NOT LIMITED TO, THOSE SHOWN. <br />42.IF NO SIZE IS SHOWN FOR DUCT SERVING DIFFUSER OR GRILLES, USE NECK SIZE SHOWN ON DIFFUSER AND <br />GRILLE SCHEDULE. <br />43.DO NOT BLOCK TUBE PULL OR SERVICE SPACE ON EQUIPMENT WITH PIPING, DUCTWORK, ETC. <br />44.ALL CONDUITS, PIPING, DUCTWORK ROUTED PARALLEL TO RATED WALLS (FIRE, FIRE/SMOKE, SMOKE OR <br />CORRIDORS) SHALL BE INSTALLED WITH MINIMUM 6" CLEARANCE TO ALLOW FOR INSPECTION OF WALL <br />PENETRATIONS AS PER FBC. CONTRACTOR SHALL PROVIDE 12" CLEARANCE WHERE POSSIBLE. <br />45.PROVIDE MINIMUM CLEARANCE OF 36" IN FRONT OF ALL 120/208V PANELS AND MINIMUM 42" IN FRONT OF <br />277/480V PANELS. PROVIDE ADEQUATE CLEARANCES PER N.E.C. <br />46.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL WORK NECESSARY TO PREPARE THE <br />STRUCTURE FOR THE INSTALLATION OF THE MECHANICAL SYSTEMS. AS PART OF DEMOLITION, ALL HOLES, <br />OPENINGS AND ANY DAMAGED MATERIALS OR SURFACES SHALL BE REPAIRED AND FINISHED TO MATCH <br />EXISTING. <br />47.ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE REQUIREMENTS OF THE OWNER. <br />48.EXACT LOCATION OF CEILING DIFFUSER, GRILLES, REGISTERS, ETC. TO BE COORDINATED WITH <br />ARCHITECTURAL REFLECTED CEILING PLANS. <br />49.PROVIDE MANUFACTURER'S CERTIFIED DATA (NOA) OR CALCULATIONS ON ALL EXTERIOR MOUNTED <br />EQUIPMENT DURING SUBMITTAL PHASE, WHICH INDICATES THAT THE EQUIPMENT CAN WITHSTAND A WIND <br />LOAD REQUIRED BY THE FBC. <br />50.HVAC CONTRACTOR SHALL PROVIDE ALL SHEET METAL AND PIPING TRANSITIONS TO DIFFUSERS, TERMINAL <br />BOXES, COILS AND OTHER SIMILAR HVAC EQUIPMENT. <br />51.ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S APPROVED PUBLISHED <br />LITERATURE. <br />52.PROVIDE INSTRUMENTAL TEST HOLES IN DUCTWORK WHEREVER VOLUME DAMPERS ARE REQUIRED. <br />53.EXACT LOCATIONS OF THERMOSTATS TO BE COORDINATED WITH ALL OTHER TRADES ARCHITECT BEFORE <br />ROUGH-IN OR INSTALLATION. <br />54.ALL EXPOSED EQUIPMENT (REGISTERS, GRILLES, DIFFUSERS, ETC.) SHALL HAVE COLORS SELECTED BY THE <br />ARCHITECT UNLESS OTHERWISE NOTED. <br />55.ALL STRAINER/RELIEF VALVE DISCHARGE PIPING SHALL RUN TO 12" ABOVE FINISHED FLOOR OR NEAREST <br />FLOOR DRAIN. <br />56.COORDINATE ALL STRUCTURAL SUPPORTS AND HOUSEKEEPING CONCRETE PAD REQUIREMENTS WITH <br />ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR ALL EQUIPMENT REQUIRING SAME. <br />57.COORDINATE ALL MOTOR, STARTER, VFD OR DISCONNECT REQUIREMENTS WITH ELECTRICAL DRAWINGS FOR <br />ALL EQUIPMENT REQUIRING SAME. <br />58.REFER TO SPECIFICATIONS BOOK FOR ALL OTHER REQUIREMENTS. <br />1423 <br />A <br />C <br />B <br />1423 <br />A <br />C <br />SHEET NUMBER <br />TITLE <br />Approved <br />Checked <br />Drawn <br />Job Number <br />ISSUE CHART <br />CONSULTANTS <br />KEYPLAN <br />PROJECT <br />B <br />PE <br />R <br />M <br />I <br />T <br /> <br />S <br />E <br />T <br /> <br />1 <br />2 <br />. <br />0 <br />6 <br />. <br />1 <br />8 <br />FIRM CERTIFICATION C.A #6057 <br />JOHN MOUDLER P.E: #33200 <br />CARLOS E. JIMENEZ P.E: #47923 <br />JOHN J. PETERS RCDD: #193108R <br />BR+A CONSULTING ENGINEERS <br />2600 DOUGLAS ROAD, SUITE 1100 <br />CORAL GABLES, FL 33134 <br />THORNTON TOMASETTI <br />101 NE THIRD AVENUE, SUITE 1170 <br />FORT LAUDERDALE, FL 3330` <br />f.954.903.9300 <br />f 954.903 9301 <br />ESI CONSULTING ENGINEERS, INC <br />1315 NW 98TH CT, UNIT 15 <br />DORAL, FL 33172 <br />t. 305.418.9177 f 305.418.9178 <br />HVAC <br />STRUCTURAL ENGINEERS <br />ELECTRICAL + PLUMBING <br />INMAN FOODSERICE GROUP <br />1330 CORAL WAY <br />SUITE 310 <br />MIAMI, FL 33145 <br />FOOD SERVICE <br />FIRM CERTIFICATION C.A. #26243 <br />IGOR F. GONZALEZ P.E. #56098 <br />1 2 /4 /2 0 1 8 6 :1 3 :3 1 P M <br />D :\U s e r s \K a r i n \D o c u m e n t s \C 0 2 0 3 2 1 1 8 -M E C H _R 1 8 _k a r i n c @ e s i c o n s u l t .c o m .r v t <br />M00-00 <br />MECHANICAL GENERAL <br />NOTES, SYMBOLS <br />LEGEND & <br />ABBREVIATIONS <br />Checker <br />Author <br />810495.000 <br />Approver <br />SIB -GATEWAY <br />PARK <br />PROJECT ADDRESS: <br />151 Sunny Isles Blvd <br />Sunny Isles Beach, FL <br />33160 <br />2800 Ponce De Leon Blvd, <br />Suite 1300, <br />Coral Gables, FL 3313 <br />t 305.569.1333 <br />f 305.569.1334 <br />www.perkinswill.com <br />MARK ISSUE DATE <br />PERMIT SET 12.06.2018