My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 12:17:26 PM
Creation date
1/31/2019 11:58:38 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />EXECUTION <br />01 73 00 - 7 <br /> <br /> <br />D. Installed Work: Keep installed work clean. Clean installed surfaces according to <br />written instructions of manufacturer or fabricator of product installed, using only <br />cleaning materials specifically recommended. If specific cleaning materials are not <br />recommended, use cleaning materials that are not hazardous to health or proper ty <br />and that will not damage exposed surfaces. <br />E. Concealed Spaces: Remove debris from concealed spaces before enclosing the <br />space. <br />F. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as <br />necessary to ensure freedom from damage and deteriorat ion at time of Substantial <br />Completion. <br />G. Waste Disposal: Do not bury or burn waste materials on-site. Do not wash waste <br />materials down sewers or into waterways. Comply with waste disposal <br />requirements in Section 01 50 00 "Temporary Facilities and Controls." <br />H. During handling and installation, clean and protect construction in progress and <br />adjoining materials already in place. Apply protective covering where required to <br />ensure protection from damage or deterioration at Substantial Completion. <br />I. Clean and provide maintenance on completed construction as frequently as <br />necessary through the remainder of the construction period. Adjust and lubricate <br />operable components to ensure operability without damaging effects. <br />J. Limiting Exposures: Supervise construction operations to ensure that no part of the <br />construction, completed or in progress, is subject to harmful, danger ous, <br />damaging, or otherwise deleterious exposure during the construction period. <br />3.7 STARTING AND ADJUSTING <br />A. Start equipment and operating components to confirm proper operation. Remove <br />malfunctioning units, replace with new units, and retest. <br />B. Adjust equipment for proper operation. Adjust operating components for proper <br />operation without binding. <br />C. Test each piece of equipment to verify proper operation. Test and adjust controls <br />and safeties. Replace damaged and malfunctioning controls and equipment. <br />D. Manufacturer's Field Service: Comply with qualification requirements in <br />Section 01 40 00 "Quality Requirements." <br />3.8 PROTECTION OF INSTALLED CONSTRUCTION <br />A. Provide final protection and maintain conditions that ensure installed Work is <br />without damage or deterioration at time of Substantial Completion. <br />B. Protection of Existing Items: Provide protection and ensure that existing items to <br />remain undisturbed by construction are maintained in condition that existed at <br />commencement of the Work.
The URL can be used to link to this page
Your browser does not support the video tag.