My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 12:17:26 PM
Creation date
1/31/2019 11:58:38 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />CLOSEOUT PROCEDURES <br />01 77 00 - 1 <br /> <br /> <br />SECTION 01 77 00 - CLOSEOUT PROCEDURES <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. Section includes administrative and procedural requirements for contract closeout, <br />including, but not limited to, the following: <br />1. Substantial Completion procedures. <br />2. Final completion procedures. <br />3. Warranties. <br />4. Final cleaning. <br />5. Repair of the Work. <br />B. Related Requirements: <br />1. Section 01 78 23 "Operation and Maintenance Data" for additional operation <br />and maintenance manual requirements. <br />2. Section 01 78 39 "Project Record Documents" for submitting Record <br />Drawings, Record Specifications, and Record Product Data. <br />3. Section 01 79 00 "Demonstration and Training" for requirements to train the <br />Owner's maintenance personnel to adjust, operate, and maintain products, <br />equipment, and systems. <br />1.2 ACTION SUBMITTALS <br />A. Product Data: For each type of cleaning agent. <br />B. Contractor's List of Incomplete Items: Initial submittal at Substantial Completion. <br />C. Certified List of Incomplete Items: Final submittal at final completion. <br />1.3 CLOSEOUT SUBMITTALS <br />A. Certificates of Release: From authorities having jurisdiction. <br />B. Certificate of Insurance: For continuing coverage. <br />C. Field Report: For pest control inspection. <br />1.4 SUBSTANTIAL COMPLETION PROCEDURES <br />A. Contractor's List of Incomplete Items: Prepare and submit a list of items to be <br />completed and corrected (Contractor's punch list), indicating the value of each item <br />on the list and reasons why the Work is incomplete.
The URL can be used to link to this page
Your browser does not support the video tag.