My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 12:17:26 PM
Creation date
1/31/2019 11:58:38 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />CLOSEOUT PROCEDURES <br />01 77 00 - 4 <br /> <br /> <br />C. Warranty Electronic File: Provide warranti es and bonds in PDF format. Assemble <br />complete warranty and bond submittal package into a single electronic PDF file with <br />bookmarks enabling navigation to each item. Provide bookmarked table of contents <br />at beginning of document. <br />1. Submit on digital media acceptable to Owner. <br />D. Warranties in Paper Form: <br />1. Bind warranties and bonds in heavy-duty, three-ring, vinyl-covered, loose- <br />leaf binders, thickness as necessary to accommodate contents, and sized to <br />receive 8-1/2-by-11-inch paper. <br />E. Provide additional copies of each warranty to include in operation and maintenance <br />manuals. <br />PART 2 - PRODUCTS <br />2.1 MATERIALS <br />A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer <br />or fabricator of the surface to be cleaned. Do not use cleaning agents that are <br />potentially hazardous to health or property or that might damage finished surfaces. <br />PART 3 - EXECUTION <br />3.1 FINAL CLEANING <br />A. General: Perform final cleaning. Conduct cleaning and waste-removal operations to <br />comply with local laws and ordinances and Federal and local environmental and <br />antipollution regulations. <br />B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. <br />Clean each surface or unit to condition expected in an average commercial building <br />cleaning and maintenance program. Comply with manufacturer's written <br />instructions. <br />1. Complete the following cleaning operations before requesting inspection for <br />certification of Substantial Completion for entire Project or for a designated <br />portion of Project: <br />a. Clean Project site, yard, and grounds, in areas disturbed by construction <br />activities, including landscape development areas, of rubbish, waste <br />material, litter, and other foreign substances. <br />b. Clean exposed exterior and interior hard-surfaced finishes to a dirt-free <br />condition, free of stains, films, and similar foreign substances. Avoid <br />disturbing natural weathering of exterior surfaces. Restore reflective <br />surfaces to their original condition.
The URL can be used to link to this page
Your browser does not support the video tag.