My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center <br />SECTION 01 25 00 -SUBSTITUTION PROCEDURES <br />PART 1 -GENERAL <br />1.1 SUMMARY <br />PERKINS+WILL <br />810495.000 <br />12/06/18 <br />A . Section includes administrative and procedural requirements for substitutions. <br />B. Related Requirements: <br />1. Section 01 60 00 "Product Requirements" for requirements for submitting <br />comparable product submittals for products by l isted manufacturers. <br />1.2 DEFINITIONS <br />A . Substitutions for Convenience: Changes proposed by Contractor or Owner that a re <br />not required in order to meet other Project requirements but may offer advantage <br />to Contractor or Owner. <br />1.3 ACTION SUBMITTALS <br />A. Substitution Requests : Submit three copies of each request for consideration. <br />Identify product or fabrication or installation method to be replaced. Include <br />Specification Section number and title and Drawing numbers and titles. <br />1. Documentation: Show compliance with requirements for substitutions and the <br />following, as applicable: <br />a . Statement indicating why specified product or fabrication or installation <br />method cannot be provided, if applicable. <br />b. Coordination of information, including a list of changes or revisions <br />needed to other parts of the Work and to construction performed by <br />Owner and separate contractors that will be necessary to accommodate <br />proposed substitution. <br />c. Detailed comparison of significant qualities of proposed substitutions <br />with those of the Work specified. Include annotated copy of applicable <br />Specification Section. Significant qualities may include attributes, such <br />as performance, weight, size, durability, visual effect, sustainable <br />design characteristics, warranties, and specific features and <br />requirements indicated. Indicate deviations, if any, from the Work <br />specified. <br />d. Product Data, including drawings and descriptions of products and <br />fabrication and installation procedures. <br />e. Samples, where applicable or requested. <br />f. Certificates and qualification data, where applicable or requested. <br />SUBSTITUTION PROCEDURES <br />01 25 00 -1
The URL can be used to link to this page
Your browser does not support the video tag.