Laserfiche WebLink
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />METAL FABRICATIONS <br /> 05 50 00 - 9 <br /> <br /> <br />3.3 INSTALLING METAL BOLLARDS <br />A. Anchor bollards in place with concrete footings. Center and align bollards in holes 3 <br />inches above bottom of excavation. Place concrete and vibrate or tamp for <br />consolidation. Support and brace bollards in position until concrete has cured. <br />B. Fill bollards solidly with concrete, mounding top surface to shed water. <br />1. Do not fill removable bollards with concrete. <br />3.4 INSTALLING WIRE ROPE PARKING GARAGE GUARDS <br />A. Install wire rope parking garage guards at locations indicated, mounted at 18 and <br />27 inches above the parking surface. Secure wire ropes to parking garage columns <br />and walls and tighten to remove slack. <br />3.5 ADJUSTING AND CLEANING <br />A. Touchup Painting: Immediately after erection, clean field welds, bolted connections, <br />and abraded areas. Paint uncoated and abraded areas with the same material as <br />used for shop painting to comply with SSPC-PA 1 for touching up shop-painted <br />surfaces. <br />1. Apply by brush or spray to provide a minimum 2.0-mil dry film thickness. <br />B. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and <br />repair galvanizing to comply with ASTM A 780/A 780M. <br />END OF SECTION