Laserfiche WebLink
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />PLASTIC-LAMINATE-FACED WOOD PANELING <br /> 06 42 19 - 5 <br /> <br /> <br />b. SierraPine; Encore FR. <br />2. For panels 3/4 inch thick and less, comply with ANSI A208.1 for Grade M-2 <br />except for the following minimum properties: modulus of rupture, 1600 psi; <br />modulus of elasticity, 300,000 psi; internal bond, 80 psi; and screw-holding <br />capacity on face and edge, 250 and 225 lbf, respectively. <br />D. Fire-Retardant Fiberboard: MDF panels complying with ANSI A208.2, made from <br />softwood fibers, synthetic resins, and fire-retardant chemicals mixed together at <br />time of panel manufacture to achieve flame-spread index of 25 or less and smoke- <br />developed index of 200 or less per ASTM E 84. <br />1. Products: Subject to compliance with requirements, provide one of the <br />following: <br />a. Panel Source International, Inc., McKillican America, Inc.; Pyroblock <br />Platinum. <br />b. SierraPine; Medite FR. <br />2.5 INSTALLATION MATERIALS <br />A. Furring, Blocking, Shims, and Hanging Strips: Fire-retardant-treated softwood <br />lumber, kiln-dried to less than 15 percent moisture content. <br />B. Anchors: Select material, type, size, and finish required for each substrate for <br />secure anchorage. Provide metal expansion sleeves or expansion bolts for post- <br />installed anchors. Use nonferrous-metal or hot-dip galvanized anchors and inserts <br />at inside face of exterior walls. <br />C. Installation Adhesive: Product recommended by panel fabricator for each substrate <br />for secure anchorage. <br />1. Adhesives shall have a VOC content of 70 g/L or less. <br />2.6 FABRICATION <br />A. Complete fabrication, including assembly, to maximum extent possible, before <br />shipment to Project site. Disassemble components only as necessary for shipment <br />and installation. Where necessary for fitting at site, provide ample allowance for <br />scribing, trimming, and fitting. <br />1. Notify Architect seven days in advance of the dates and times paneling <br />fabrication will be complete. <br />B. Shop cut openings, to maximum extent possible, to receive hardware, appliances, <br />plumbing fixtures, electrical work, and similar items. Locate openings accurately <br />and use templates or roughing-in diagrams to produce accurately sized and shaped <br />openings. Sand edges of cutouts to remove splinters and burrs.