My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />PREPARATION FOR REROOFING <br /> 07 01 50.19 - 3 <br /> <br /> <br />a. Use roof-drain plugs specifically designed for this purpose. <br />b. Remove roof-drain plugs at end of each workday, when no work is <br />taking place, or when rain is forecast. <br />2. If roof drains are temporarily blocked or unserviceable due to roofing system <br />removal or partial installation of new roofing system, provide alternative <br />drainage method to remove water and eliminate ponding. <br />a. Do not permit water to enter into or under existing roofing system <br />components that are to remain. <br />3.2 ROOF TEAR-OFF <br />A. Lower removed roofing materials to ground and onto lower roof levels, using dust- <br />tight chutes or other acceptable means of removing materials from roof areas. <br />B. Partial Roof Tear-off: Where indicated on Drawings, remove existing roofing down <br />to concrete deck and immediately check for presence of moisture. <br />1. Remove wet or damp materials below existing roofing and above deck as <br />directed by Architect. <br />2. Inspect wood blocking, curbs, and nailers for deterioration and damage. <br />a. If wood blocking, curbs, or nailers have deteriorated, immediately notify <br />Architect. <br />3.3 DECK PREPARATION <br />A. Inspect deck after tear-off of roofing system. <br />B. If deck surface is unsuitable for receiving new roofing or if structural integrity of <br />deck is suspect, immediately notify Architect. <br />1. Do not proceed with installation until directed by Architect. <br />3.4 BASE FLASHING REMOVAL <br />A. Remove existing base flashings. <br />1. Clean substrates of contaminants, such as asphalt, sheet materials, dirt, and <br />debris. <br />B. Do not damage metal counterflashings that are to remain. <br />1. Replace metal counterflashings damaged during removal with <br />counterflashings of same metal, weight or thickness, and finish as existing. <br />C. Inspect parapet sheathing, wood blocking, curbs, and nailers for deterioration and <br />damage.
The URL can be used to link to this page
Your browser does not support the video tag.