My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />STRUCTURAL-SEALANT-GLAZED CURTAIN WALLS <br /> 08 44 23 - 2 <br /> <br /> <br />g. Repeat water penetration under static pressure when tested according <br />to ASTM E 331. <br />h. Thermal testing. <br />i. Structural performance at maximum 150 percent of positive and <br />negative wind-load design pressures when tested according to <br />ASTM E 330. <br />j. Wind-induced building structural movement testing according to AAMA <br />501.4 <br />k. Loads on window washing tie back anchor within ACW/AWW. <br />B. Preconstruction Sealant Testing: Perform sealant manufacturer's standard tests for <br />compatibility with and adhesion of each material that will come in contact wit h <br />sealants and each condition. <br />1. Test a minimum five production-run samples each of metal, glazing, and <br />other material. <br />2. Prepare samples using techniques and primers required for installed <br />assemblies. <br />3. Approved sealant manufacturer shall perform tests under environmental <br />conditions that duplicate those under which assemblies will be installed. <br />4. For materials that fail tests, determine corrective measures necessary to <br />prepare each material to ensure compatibility with and adhesion of sealants <br />including, but not limited to, specially formulated primers. After performing <br />these corrective measures on the minimum number of samples required for <br />each material, retest materials. <br />C. Preconstruction Energy Performance Testing. <br />1.4 ACTION SUBMITTALS <br />A. Product Data: For each type of product. <br />B. Shop Drawings: Include plans, elevations, sections, full-size details, and <br />attachments to other work. <br />1. Show connection to and continuity with adjacent thermal, weather, air, and <br />vapor barriers. <br />C. Samples: For each exposed finish required. <br />D. Delegated-Design Submittal: For structural-sealant-glazed curtain walls indicated to <br />comply with performance requirements and design criteria, including analysis data <br />signed and sealed by the qualified professional engineer responsible for their <br />preparation. <br />1.5 INFORMATIONAL SUBMITTALS <br />A. Product test reports.
The URL can be used to link to this page
Your browser does not support the video tag.