Laserfiche WebLink
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />PROJECT MANAGEMENT AND COORDINATION <br />01 31 00 - 1 <br /> <br /> <br />SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. Section includes administrative provisions for coordinating construction operations <br />on Project including, but not limited to, the following: <br />1. General coordination procedures. <br />2. Coordination drawings. <br />3. RFIs. <br />4. Digital project management procedures. <br />5. Project meetings. <br />B. Related Requirements: <br />1. Section 01 73 00 "Execution" for procedures for coordinating general <br />installation and field-engineering services, including establishment of <br />benchmarks and control points. <br />1.2 DEFINITIONS <br />A. BIM: Building Information Modeling. <br />B. RFI: Request for Information. Request from Owner, Construction Manager, Program <br />Manager, Architect, or Contractor seeking information required by or clarifications <br />of the Contract Documents. <br />1.3 INFORMATIONAL SUBMITTALS <br />A. Subcontract List: Prepare a written summary identifying individuals or firms <br />proposed for each portion of the Work, including those who are to fu rnish products <br />or equipment fabricated to a special design. Include the following information in <br />tabular form: <br />1. Name, address, telephone number, and email address of entity performing <br />subcontract or supplying products. <br />2. Number and title of related Specification Section(s) covered by subcontract. <br />3. Drawing number and detail references, as appropriate, covered by <br />subcontract. <br />1.4 GENERAL COORDINATION PROCEDURES <br />A. Coordination: Coordinate construction operations included in different Sections of <br />the Specifications to ensure efficient and orderly installation of each part of the