My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />DOOR HARDWARE <br />08 71 00 - 2 <br /> <br /> <br />B. Door Hardware Schedule: Prepared by or under the supervision of supplier, detailing <br />fabrication and assembly of door hardware, as well as procedures and diagrams. <br />Coordinate the final Door Hardware Schedule with doors, frames, and related work to <br />ensure proper size, thickness, hand, function, and finish of door hardware. <br />1. Format: Comply with scheduling sequence and vertical format in DHI's <br />"Sequence and Format for the Hardware Schedule." <br />2. Organization: Organize the Door Hardware Schedule into door hardware sets <br />indicating complete designations of every item required for each door or <br />opening. Organize door hardware sets in same order as in the Door Hardware <br />Sets at the end of Part 3. Submittals that do not follow the same format and <br />order as the Door Hardware Sets will be rejected and subject to resubmission. <br />3. Content: Include the following information: <br />a. Type, style, function, size, label, hand, and finish of each door hardware <br />item. <br />b. Manufacturer of each item. <br />c. Fastenings and other pertinent information. <br />d. Location of door hardware set, cross-referenced to Drawings, both on floor <br />plans and in door and frame schedule. <br />e. Explanation of abbreviations, symbols, and codes contained in schedule. <br />f. Mounting locations for door hardware. <br />g. Door and frame sizes and materials. <br />h. Warranty information for each product. <br />4. Submittal Sequence: Submit the final Door Hardware Schedule at earliest <br />possible date, particularly where approval of the Door Hardware Schedule must <br />precede fabrication of other work that is critical in the Project construction <br />schedule. Include Product Data, Samples, Shop Drawings of other work affected <br />by door hardware, and other information essential to the coordinated review of <br />the Door Hardware Schedule. <br />C. Shop Drawings: Details of electrified access control hardware indicating the following: <br />1. Wiring Diagrams: Upon receipt of approved schedules, submit detailed system <br />wiring diagrams for power, signaling, monitoring, communication, and control of <br />the access control system electrified hardware. Differentiate between <br />manufacturer-installed and field-installed wiring. Include the following: <br />a. Elevation diagram of each unique access controlled opening showing <br />location and interconnection of major system components with respect to <br />their placement in the respective door openings. <br />b. Complete (risers, point-to-point) access control system block wiring <br />diagrams. <br />c. Wiring instructions for each electronic component scheduled herein. <br />2. Electrical Coordination: Coordinate with related sections the voltages and wiring <br />details required at electrically controlled and operated hardware openings. <br />D. Keying Schedule: After a keying meeting with the owner has taken place prepare a <br />separate keying schedule detailing final instructions. Submit the keying schedule in <br />electronic format. Include keying system explanation, door numbers, key set symbols,
The URL can be used to link to this page
Your browser does not support the video tag.