My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />DOOR HARDWARE <br />08 71 00 - 26 <br /> <br /> <br /> <br />Set: 25.0 <br />Doors: 117A <br />Description: Banquet Hall Glass Door <br /> <br />1 All Hardware by Glass Door Supplier OT <br /> <br />Set: 26.0 <br />Doors: 130A <br />Description: Kiosk Aluminum Storefront <br /> <br />1 Cylinder Cylinder as Required US10BE SA <br />1 All Hardware by Door Supplier OT <br /> <br />Notes: Verify cylinder requirements, if any. All exterior doors on this project shall meet FBC <br />standards for windstorm. The door hardware specified is listed as a basis of design. If alternate <br />hardware is proposed, please provide third-party test results and compliance information to <br />architect. <br /> <br />Set: 27.0 <br />Doors: E100, E-101, E-101B, E-101C, E-101D, E-117B, E-117C, E-117D <br />Description: Existing Aluminum Storefront Doors <br /> <br />1 Existing Hardware to be Field Verified by Aluminum Door Supplier <br /> OT <br /> <br />Notes: All exterior doors on this project shall meet FBC standards for windstorm. <br /> <br />Set: 28.0 <br />Doors: E-121B <br />Description: Existing Delivery Entrance <br /> <br />1 Existing Hardware to Remain OT <br /> <br />Notes: All exterior doors on this project shall meet FBC standards for windstorm. <br /> <br />Set: 29.0 <br />Doors: E-121C, E-131A, E-131B <br />Description: Existing Doors <br /> <br />1 Existing Hardware to be Field Verified OT <br />END OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.