My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />MIRRORS <br /> 08 83 00 - 6 <br /> <br /> <br />c. After mastic is applied, align mirrors and press into place while <br />maintaining a minimum airspace of 1/8 inch between back of mirrors <br />and mounting surface. <br />3.4 CLEANING AND PROTECTION <br />A. Protect mirrors from breakage and contaminating substances resulting from <br />construction operations. <br />B. Do not permit edges of mirrors to be exposed to standing water. <br />C. Maintain environmental conditions that prevent mirrors from being exposed to <br />moisture from condensation or other sources for continuous periods of time. <br />D. Clean exposed surface of mirrors not more than four days before date scheduled for <br />inspections that establish date of Substantial Completion. Clean mirrors as <br />recommended in writing by mirror manufacturer. <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.