My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />CEMENT PLASTERING <br /> 09 24 00 - 1 <br /> <br /> <br />SECTION 09 24 00 - CEMENT PLASTERING <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. Section Includes: <br />1. Exterior vertical plasterwork (stucco). <br />2. Exterior horizontal and nonvertical plasterwork (stucco). <br />1.2 ACTION SUBMITTALS <br />A. Product Data: For each type of product. <br />B. Shop Drawings: Show locations and installation of control and expansion joints, <br />including plans, elevations, sections, details of components, and attachments to <br />other work. <br />1.3 QUALITY ASSURANCE <br />A. Mockups: Build mockups to verify selections made under Sample submittals, to <br />demonstrate aesthetic effects, and to set quality standards for materials and <br />execution. <br />1. Build mockups for each substrate and finish texture indicated for cement <br />plastering, including accessories. <br />a. Size: 100 sq. ft. in surface area. <br />2. Approval of mockups does not constitute approval of deviations from the <br />Contract Documents contained in mockups unless Architect specifically <br />approves such deviations in writing. <br />3. Subject to compliance with requirements, approved mockups may become <br />part of the completed Work if undisturbed at time of Substantial Completion. <br />1.4 DELIVERY, STORAGE, AND HANDLING <br />A. Store materials inside under cover, and keep them dr y and protected against <br />damage from weather, moisture, direct sunlight, surface contamination, corrosion, <br />construction traffic, and other causes. <br />1.5 FIELD CONDITIONS <br />A. Comply with ASTM C 926 requirements.
The URL can be used to link to this page
Your browser does not support the video tag.