Laserfiche WebLink
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />CEMENT PLASTERING <br /> 09 24 00 - 6 <br /> <br /> <br />3.7 CLEANING AND PROTECTION <br />A. Remove temporary protection and enclosure of other work after plastering is <br />complete. Promptly remove plaster from door frames, windows, and other surfaces <br />not indicated to be plastered. Repair floors, walls, and other surfaces stained, <br />marred, or otherwise damaged during plastering. <br />END OF SECTION