My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />WOOD PANEL CEILINGS <br />09 54 26 - 3 <br /> <br /> <br />concurrent with other warranties made by the Contractor under the requirements of <br />the Contract Documents. <br />1.8 MAINTENANCE <br />A. Extra Materials: Deliver extra materials to Owner. Furnish extra materials described <br />below that match products installed. Packaged with protective covering for storage <br />and identified with appropriate labels. <br />1. Ceiling Units: Furnish quantity of full-size units equal to 5.0 percent of amount <br />installed. <br />2. Exposed Suspension System Components: Furnish quantity of each exposed <br />suspension component equal to 2.0 percent of amount installed. <br />PART 2 - PRODUCTS <br />2.1 MANUFACTURERS <br />A. Basis-of-Design Product: Provide product indicated. <br />2.2 WOOD VENEER CEILING UNITS <br />A. Ceiling Panels Type AP: <br />1. Surface Texture: Smooth. <br />2. Composition: Fire-retardant Particle Board. <br />3. Species/Finish: As indicated. <br />4. Size: As indicated. <br />5. Profile: As indicated. <br />6. Edge Banding and Trim: To match face veneer. <br />7. Noise Reduction Coefficient (NRC): ASTM C 423, Classified with UL label on <br />product carton 0.50. <br />B. Ceiling Accessories: <br />1. Suspension System: Provide system indicated. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Do not proceed with installation until all wet work such as concrete, terrazzo, <br />plastering and painting has been completed and thoroughly dried out. <br />B. Proper designs for both supply air and return air, maintenance of the HVAC filters and <br />building interior space are essential to minimize soiling. Before starting the HVAC
The URL can be used to link to this page
Your browser does not support the video tag.