My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />HIGH-PERFORMANCE COATINGS <br /> 09 96 00 - 2 <br /> <br /> <br />1.4 MAINTENANCE MATERIAL SUBMITTALS <br />A. Furnish extra materials, from the same product run, that match products installed <br />and that are packaged with protective covering for storage and identified with <br />labels describing contents. <br />1. Coatings: 5 percent, but not less than 1 gal. of each material and color <br />applied. <br />1.5 QUALITY ASSURANCE <br />A. Mockups: Apply mockups of each coating system indicated to verify preliminary <br />selections made under Sample submittals and to demonstrate aesthetic effects and <br />set quality standards for materials and execution. <br />1. Architect will select one surface to represent surfaces and conditions for <br />application of each coating system. <br />2. Final approval of color selections will be based on mockups. <br />a. If preliminary color sel ections are not approved, apply additional <br />mockups of additional colors selected by Architect at no added cost to <br />Owner. <br />3. Approval of mockups does not constitute approval of deviations from the <br />Contract Documents contained in mockups unless Architect specifically <br />approves such deviations in writing. <br />4. Subject to compliance with requirements, approved mockups may become <br />part of the completed Work if undisturbed at time of Substantial Completion. <br />1.6 DELIVERY, STORAGE, AND HANDLING <br />A. Store materials not in use in tightly covered containers in well -ventilated areas with <br />ambient temperatures continuously maintained at not less than 45 deg F. <br />1. Maintain containers in clean condition, free of foreign materials and residue. <br />2. Remove rags and waste from storage areas daily. <br />1.7 FIELD CONDITIONS <br />A. Apply coatings only when temperature of surfaces to be coated and ambient air <br />temperatures are between 50 and 95 deg F. <br />B. Do not apply coatings when relative humidity exceeds 85 percent; at temperatures <br />less than 5 deg F above the dew point; or to damp or wet surfaces. <br />C. Do not apply exterior coatings in snow, rain, fog, or mist.
The URL can be used to link to this page
Your browser does not support the video tag.