Laserfiche WebLink
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />HIGH-PERFORMANCE COATINGS <br /> 09 96 00 - 4 <br /> <br /> <br />3. Owner may direct Contractor to stop applying coatings if test results show <br />materials being used do not comply with product requirements. Contractor <br />shall remove noncomplying coating materials from Project site, pay for <br />testing, and recoat surfaces coated with rejected materials. Contractor will be <br />required to remove rejected materials from previously coated surfaces if, on <br />recoating with complying materials, the two coatings are incompatible. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine substrates and conditions, with Applicator present, for compliance with <br />requirements for maximum moisture content and other conditions affecting <br />performance of the Work. <br />B. Verify suitability of substrates, including surface conditions and compatibility, with <br />existing finishes and primers. <br />C. Proceed with coating application only after unsatisfactory conditions have been <br />corrected. <br />1. Application of coating indicates acceptance of surfaces and conditions. <br />3.2 PREPARATION <br />A. Comply with manufacturer's written instructions and recommendations in "MPI <br />Architectural Painting Specification Manual" applicable to substrates and coating <br />systems indicated. <br />B. Remove hardware, covers, plates, and similar items already in place that are <br />removable and are not to be painted. If removal is impractical or impossible <br />because of size or weight of item, provide surface-applied protection before surface <br />preparation and painting. <br />1. After completing painting operations, use workers skilled in the trades <br />involved to reinstall items that were removed. Remove surface-applied <br />protection if any. <br />C. Clean substrates of substances that could impair bond of coatings, including dust, <br />dirt, oil, grease, and incompatible paints and encapsulants. <br />1. Remove incompatible primers and reprime substrate with compatible primers <br />or apply tie coat as required to produce coating systems indicated. <br />D. Steel Substrates: Remove rust, loose mill scale, and shop primer if any. Clean <br />using methods recommended in writing by paint manufacturer but not less than the <br />following: <br />1. SSPC-SP 6/NACE No. 3.