My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />SOLID-SURFACE TOILET COMPARTMENTS <br /> 10 21 13.19 - 5 <br /> <br /> <br />2. Full-Height (Continuous) Brackets: Secure panels to walls and to pilasters <br />with full-height brackets. <br />a. Locate bracket fasteners so holes for wall anchors occur in masonry or <br />tile joints. <br />b. Align brackets at pilasters with brackets at walls. <br />B. Ceiling-Hung Units: Secure pilasters to supporting structure and level, plumb, and <br />tighten. Hang doors and adjust so bottoms of doors are level with bottoms of <br />pilasters when doors are in closed position. <br />3.3 ADJUSTING <br />A. Hardware Adjustment: Adjust and lubricate hardware according to hardware <br />manufacturer's written instructions for proper operation. Set hinges on in-swinging <br />doors to hold doors open approximately 30 degrees from closed position when <br />unlatched. Set hinges on out-swinging doors to return doors to fully closed position. <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.