My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />PHOTOGRAPHIC DOCUMENTATION <br />01 32 33 - 1 <br /> <br /> <br />SECTION 01 32 33 - PHOTOGRAPHIC DOCUMENTATION <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. Section includes administrative and procedural requirements for the following: <br />1. Preconstruction photographs. <br />2. Periodic construction photographs. <br />3. Final completion construction photographs. <br />B. Related Requirements: <br />1. Section 01 77 00 "Closeout Procedures" for submitting photographic <br />documentation as Project Record Documents at Project closeout. <br />1.2 INFORMATIONAL SUBMITTALS <br />A. Key Plan: Submit key plan of Project site and building with notation of vantage <br />points marked for location and direction of each photograph. Indicate elevation or <br />story of construction. Include same information as corresponding photographic <br />documentation. <br />B. Digital Photographs: Submit image files within three (3) days of taking <br />photographs. <br />1. Submit photos by uploading to web-based project software site. Include copy <br />of key plan indicating each photograph's location and direction. <br />2. Identification: Provide the following information with each image description : <br />a. Name of Project. <br />b. Name and contact information for photographer. <br />c. Name of Architect <br />d. Name of Contractor. <br />e. Date photograph was taken. <br />f. Description of location, vantage point, and direction. <br />g. Unique sequential identifier keyed to accompanying key plan. <br />1.3 QUALITY ASSURANCE <br />A. Photographer Qualifications: An individual who has been regularly engaged as a <br />professional photographer of construction projects for not less than three years.
The URL can be used to link to this page
Your browser does not support the video tag.