Laserfiche WebLink
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />WALL PROTECTION <br /> 10 26 00 - 4 <br /> <br /> <br />C. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 PREPARATION <br />A. Complete finishing operations, including painting, before installing wall protection. <br />B. Before installation, clean substrate to remove dust, debris, and loose particles. <br />3.3 INSTALLATION <br />A. Installation Quality: Install wall protection according to manufacturer's written <br />instructions, level, plumb, and true to line without distortions. Do not use materials <br />with chips, cracks, voids, stains, or other defects that might be visible in the <br />finished Work. <br />B. Abuse-Resistant Wall Covering: Install top and edge moldings, corners, and divider <br />bars as required for a complete installation. <br />3.4 CLEANING <br />A. Immediately after completion of installation, clean plastic covers and accessories <br />using a standard ammonia-based household cleaning agent. <br />B. Remove excess adhesive using methods and materials recommended in writing by <br />manufacturer. <br />END OF SECTION