My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />WALL PROTECTION <br /> 10 26 00 - 4 <br /> <br /> <br />C. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 PREPARATION <br />A. Complete finishing operations, including painting, before installing wall protection. <br />B. Before installation, clean substrate to remove dust, debris, and loose particles. <br />3.3 INSTALLATION <br />A. Installation Quality: Install wall protection according to manufacturer's written <br />instructions, level, plumb, and true to line without distortions. Do not use materials <br />with chips, cracks, voids, stains, or other defects that might be visible in the <br />finished Work. <br />B. Abuse-Resistant Wall Covering: Install top and edge moldings, corners, and divider <br />bars as required for a complete installation. <br />3.4 CLEANING <br />A. Immediately after completion of installation, clean plastic covers and accessories <br />using a standard ammonia-based household cleaning agent. <br />B. Remove excess adhesive using methods and materials recommended in writing by <br />manufacturer. <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.